40 CFR Appendix Table 3 to Subpart ZZZZZ of Part 63 - Table 3 to Subpart ZZZZZ of Part 63—Applicability of General Provisions to New and Existing Affected Sources Classified as Large Foundries
Table 3 to Subpart ZZZZZ of Part 63—Applicability of General Provisions to New and Existing Affected Sources Classified as Large Foundries
As required in § 63.10900(a), you must meet each requirement in the following table that applies to you:
Citation | Subject | Applies to large
foundry? |
Explanation |
---|---|---|---|
63.1 | Applicability | Yes | |
63.2 | Definitions | Yes | |
63.3 | Units and abbreviations | Yes | |
63.4 | Prohibited activities | Yes | |
63.5 | Construction/reconstruction | Yes | |
63.6(a) through (d) | Compliance applicability and dates | Yes | |
63.6(e) | Operating and maintenance requirements | No | This subpart specifies operating and maintenance requirements. |
63.6(f)(1) | Applicability of non-opacity emission standards | No | This subpart specifies applicability of non-opacity emission standards. |
63.6(f)(2) through (3) | Methods and finding of compliance with non-opacity emission standards | Yes | |
63.6(g) | Use of an alternative nonopacity emission standard | Yes | |
63.6(h)(1) | Applicability of opacity and visible emissions standards | No | This subpart specifies applicability of opacity and visible emission standards. |
63.6(h)(2) through (9) | Methods and other requirements for opacity and visible emissions standards | Yes | |
63.6(i) through (j) | Compliance extension and Presidential compliance exemption | Yes | |
63.7(a)(1) through (2) | Applicability and performance test dates | No | This subpart specifies applicability and performance test dates. |
63.7(a)(3) through (4) | Administrators rights to require a performance test and force majeure provisions | Yes | |
63.7(b) through (d) | Notification of performance test, quality assurance program, and testing facilities | Yes | |
63.7(e)(1) | Performance test conditions | No | This subpart specifies performance test conditions. |
63.7(e)(2) through (4), (f) through (h) | Other performance testing requirements | Yes | |
63.8(a)(1) through (3), (b), (c)(1)(ii), (c)(2) through (3), (c)(6) through (8), (d)(1) through (2) | Monitoring requirements | Yes | |
63.8(a)(4) | Additional monitoring requirements for control devices in § 63.11 | No | |
63.8(c)(1)(i), (c)(1)(iii) | Operation and maintenance of continuous monitoring systems | No | Not necessary in light of other requirements of § 63.8 that apply. |
63.8(c)(4) | Continuous monitoring system (CMS) requirements | No | |
63.8(c)(5) | Continuous opacity monitoring system (COMS) minimum procedures | No | |
63.8(d)(3) | Quality control program | No | This subpart specifies records that must be kept associated with site-specific performance evaluation test plan. |
63.8(e), (f)(1) through (6), (g)(1) through (4) | Performance evaluations and alternative monitoring | Yes | |
63.8(g)(5) | Data reduction | No | |
63.9 | Notification requirements | Yes. | Except for opacity performance tests. |
63.10(a), (b)(1), (b)(2)(xii) through (xiv), (b)(3), (d)(1) through (4), (e)(1) through (2), (f) | Recordkeeping and reporting requirements | Yes | |
63.10(b)(2)(i) through (xi) | Malfunction and CMS records | No | |
63.10(c) | Additional records for CMS | No | This subpart specifies records requirements. |
63.10(d)(5) | Periodic startup, shutdown, and malfunction reports | No | |
63.10(e)(3) | Excess emissions reports | No | This subpart specifies reporting requirements. |
63.10(e)(4) | Reporting COMS data | No | |
63.11 | Control device requirements | No | |
63.12 | State authority and delegations | Yes | |
63.13(a) | Reporting to EPA regional offices | Yes | Except: reports and notifications required to be submitted to CEDRI meet this obligation through electronic reporting. |
63.13(b) through 63.16 | Addresses of state air pollution control agencies. Incorporation by reference. Availability of information and confidentiality. Performance track provisions | Yes |
[85 FR 56105, Sept. 10, 2020]