43 CFR 3212.22 - What criteria establish a new facility for the purpose of obtaining a production incentive?

§ 3212.22 What criteria establish a new facility for the purpose of obtaining a production incentive?
(a) Criteria for determining whether a project is a new facility for the purpose of obtaining a production incentive include:
(1) The project requires a new site license or facility construction permit if it is on Federal lands;
(2) The project requires a new Commercial Use Permit;
(3) The project includes at least one new turbine-generator unit;
(4) The project involves a new sales contract;
(5) The project involves a new site or substantially larger footprint; and
(6) The project is not contiguous to an existing project.
(b) Generally, a new facility will not:
(1) Be permitted only with a Geothermal Drilling Permit;
(2) Be constructed entirely within the footprint of an existing facility; or
(3) Involve only well-field projects such as drilling new wells, increasing injection, and enhanced recovery projects.

Title 43 published on 2013-10-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
Public Laws