43 CFR 3264.12 - What must I submit to BLM after I abandon a well?

§ 3264.12 What must I submit to BLM after I abandon a well?
Send us a well abandonment report within 30 days after you abandon a well. If you plan to restore the site at a later date, you may submit a separate report within 30 days after completing site restoration. The well abandonment report must contain:
(a) A complete chronology of all work done;
(b) A description of each plug, including:
(1) Type and amount of cement used;
(2) Depth that the drill pipe or tubing was run to set the plug;
(3) Depth to top of plug; and
(4) If the plug was verified, whether it was done by tagging or pressure testing; and
(c) A description of surface restoration procedures.

Title 43 published on 2013-10-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
Public Laws