43 CFR 3276.12 - What information must I give BLM in the monthly report for facility operations?

§ 3276.12 What information must I give BLM in the monthly report for facility operations?
(a) For all electrical generation facilities, include in your monthly report of facility operations:
(1) Mass of steam and/or hot water, in klbs, used or brought into the facility. For facilities using both steam and hot water, you must report the mass of each;
(2) The temperature of the steam or hot water in deg. F;
(3) The pressure of the steam or hot water in psi. You must also specify whether this is psig or psia;
(4) Gross generation in kilowatt hours (kwh);
(5) Net generation at the tailgate of the facility in kwh;
(6) Temperature in deg. F and volume of the steam or hot water exiting the facility;
(7) The number of hours the plant was on line;
(8) A brief description of any outages; and
(9) Any other information we may require.
(b) For electrical generation facilities where Federal royalty is based on the sale of electricity to a utility, in addition to the information required under paragraph (a) of this section, you must include the following information in your monthly report of facility operations:
(1) Amount of electricity delivered to the sales point in kwh, if the sales point is different from the tailgate of the facility;
(2) Amount of electricity lost to transmission;
(3) A report from the utility purchasing the electricity documenting the total number of kwh delivered to the sales point during the month, or monthly reporting period if it is not a calendar month, and the number of kwh delivered during diurnal and seasonal pricing periods; and
(4) Any other information we may require.

Title 43 published on 2014-10-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
Public Laws