47 CFR 22.913 - Effective radiated power limits.

Status message

There are 5 Updates appearing in the Federal Register for 47 CFR 22. View below or at eCFR (GPOAccess)
§ 22.913 Effective radiated power limits.
The effective radiated power (ERP) of transmitters in the Cellular Radiotelephone Service must not exceed the limits in this section.
(a) Maximum ERP. In general, the effective radiated power (ERP) of base transmitters and cellular repeaters must not exceed 500 Watts. However, for those systems operating in areas more than 72 km (45 miles) from international borders that:
(1) Are located in counties with population densities of 100 persons or fewer per square mile, based upon the most recently available population statistics from the Bureau of the Census; or,
(2) Extend coverage on a secondary basis into cellular unserved areas, as those areas are defined in § 22.949, the ERP of base transmitters and cellular repeaters of such systems must not exceed 1000 Watts. The ERP of mobile transmitters and auxiliary test transmitters must not exceed 7 Watts.
(b) Height-power limit. The ERP of base transmitters must not exceed the amount that would result in an average distance to the service area boundary of 79.1 kilometers (49 miles) for cellular systems authorized to serve the Gulf of Mexico MSA and 40.2 kilometers (25 miles) for all other cellular systems. The average distance to the service area boundary is calculated by taking the arithmetic mean of the distances determined using the procedures specified in § 22.911 for the eight cardinal radial directions.
(c) Coordination exemption. Licensees need not comply with the height-power limit in paragraph (b) of this section if the proposed operation is coordinated with the licensees of all affected cellular systems on the same channel block within 121 kilometers (75 miles) and concurrence is obtained.
[59 FR 59507, Nov. 17, 1994, as amended at 69 FR 75171, Dec. 15, 2004]

Title 47 published on 2013-10-01

The following are only the Rules published in the Federal Register after the published date of Title 47.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-12-05; vol. 79 # 234 - Friday, December 5, 2014
    1. 79 FR 72143 - Cellular Service, Including Changes in Licensing of Unserved Area
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Final rule.
      Effective January 5, 2015, except for the amendments to 47 CFR 22.165(e), 47 CFR 22.948, and 47 CFR 22.953, which contain information collection requirements that have not yet been approved by the Office of Management and Budget (OMB). The Commission will publish a document in the Federal Register announcing the effective date of those three amendments.
      47 CFR Parts 1 and 22

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 47 published on 2013-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR 22 after this date.

  • 2014-12-05; vol. 79 # 234 - Friday, December 5, 2014
    1. 79 FR 72143 - Cellular Service, Including Changes in Licensing of Unserved Area
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Final rule.
      Effective January 5, 2015, except for the amendments to 47 CFR 22.165(e), 47 CFR 22.948, and 47 CFR 22.953, which contain information collection requirements that have not yet been approved by the Office of Management and Budget (OMB). The Commission will publish a document in the Federal Register announcing the effective date of those three amendments.
      47 CFR Parts 1 and 22