47 CFR 22.917 - Emission limitations for cellular equipment.

Status message

There are 5 Updates appearing in the Federal Register for 47 CFR 22. View below or at eCFR (GPOAccess)
§ 22.917 Emission limitations for cellular equipment.
The rules in this section govern the spectral characteristics of emissions in the Cellular Radiotelephone Service.
(a) Out of band emissions. The power of any emission outside of the authorized operating frequency ranges must be attenuated below the transmitting power (P) by a factor of at least 43 10 log(P) dB.
(b) Measurement procedure. Compliance with these rules is based on the use of measurement instrumentation employing a resolution bandwidth of 100 kHz or greater. In the 1 MHz bands immediately outside and adjacent to the frequency block a resolution bandwidth of at least one percent of the emission bandwidth of the fundamental emission of the transmitter may be employed. A narrower resolution bandwidth is permitted in all cases to improve measurement accuracy provided the measured power is integrated over the full required measurement bandwidth (i.e. 100 kHz or 1 percent of emission bandwidth, as specified). The emission bandwidth is defined as the width of the signal between two points, one below the carrier center frequency and one above the carrier center frequency, outside of which all emissions are attenuated at least 26 dB below the transmitter power.
(c) Alternative out of band emission limit. Licensees in this service may establish an alternative out of band emission limit to be used at specified band edge(s) in specified geographical areas, in lieu of that set forth in this section, pursuant to a private contractual arrangement of all affected licensees and applicants. In this event, each party to such contract shall maintain a copy of the contract in their station files and disclose it to prospective assignees or transferees and, upon request, to the FCC.
(d) Interference caused by out of band emissions. If any emission from a transmitter operating in this service results in interference to users of another radio service, the FCC may require a greater attenuation of that emission than specified in this section.
[67 FR 77191, Dec. 17, 2002]

Title 47 published on 2013-10-01

The following are only the Rules published in the Federal Register after the published date of Title 47.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-12-05; vol. 79 # 234 - Friday, December 5, 2014
    1. 79 FR 72143 - Cellular Service, Including Changes in Licensing of Unserved Area
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Final rule.
      Effective January 5, 2015, except for the amendments to 47 CFR 22.165(e), 47 CFR 22.948, and 47 CFR 22.953, which contain information collection requirements that have not yet been approved by the Office of Management and Budget (OMB). The Commission will publish a document in the Federal Register announcing the effective date of those three amendments.
      47 CFR Parts 1 and 22

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 47 published on 2013-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR 22 after this date.

  • 2014-12-05; vol. 79 # 234 - Friday, December 5, 2014
    1. 79 FR 72143 - Cellular Service, Including Changes in Licensing of Unserved Area
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Final rule.
      Effective January 5, 2015, except for the amendments to 47 CFR 22.165(e), 47 CFR 22.948, and 47 CFR 22.953, which contain information collection requirements that have not yet been approved by the Office of Management and Budget (OMB). The Commission will publish a document in the Federal Register announcing the effective date of those three amendments.
      47 CFR Parts 1 and 22