47 CFR 25.263 - Information sharing requirements for SDARS terrestrial repeater operators.

Status message

There are 9 Updates appearing in the Federal Register for 47 CFR 25. View below or at eCFR (GPOAccess)
§ 25.263 Information sharing requirements for SDARS terrestrial repeater operators.
This section requires SDARS licensees in the 2320-2345 MHz band to share information regarding the location and operation of terrestrial repeaters with WCS licensees in the 2305-2320 MHz and 2345-2360 MHz bands. Section 27.72 of this chapter requires WCS licensees to share information regarding the location and operation of base stations in the 2305-2320 MHz and 2345-2360 MHz bands with SDARS licensees in the 2320-2345 MHz band.
(a) SDARS licensees must select terrestrial repeater sites and frequencies, to the extent practicable, to minimize the possibility of harmful interference to WCS base station operations in the 2305-2320 MHz and 2345-2360 MHz bands.
(b) Notice requirements. SDARS licensees that intend to operate a new terrestrial repeater must, before commencing such operation, provide 10 business days prior notice to all potentially affected WCS licensees. SDARS licensees that intend to modify an existing repeater must, before commencing such modified operation, provide 5 business days prior notice to all potentially affected WCS licensees.
(1) For purposes of this section, a “potentially affected WCS licensee” is a WCS licensee that:
(i) Is authorized to operate a base station in the 2305-2315 MHz or 2350-2360 MHz bands in the same Major Economic Area (MEA) as that in which the terrestrial repeater is to be located;
(ii) Is authorized to operate a base station in the 2315-2320 MHz or 2345-2350 MHz bands in the same Regional Economic Area Grouping (REAG) as that in which the terrestrial repeater is to be located.
(iii) In addition to the WCS licensees identified in paragraphs (b)(1)(i) and (ii) of this section, in cases in which the SDARS licensee plans to deploy or modify a terrestrial repeater within 5 kilometers of the boundary of an MEA or REAG in which the terrestrial repeater is to be located, a potentially affected WCS licensee is one that is authorized to operate a WCS base station in that neighboring MEA or REAG within 5 kilometers of the location of the terrestrial repeater.
(2) For the purposes of this section, a business day is defined by § 1.4(e)(2) of this chapter.
(c) Contents of notice.
(1) Notification must be written (e.g., certified letter, fax, or e-mail) and include the licensee's name, and the name, address, and telephone number of its coordination representative, unless the SDARS licensee and all potentially affected WCS licensees reach a mutual agreement to provide notification by some other means. WCS licensees and SDARS licensees may establish such a mutually agreeable alternative notification mechanism without prior Commission approval, provided that they comply with all other requirements of this section.
(2) Regardless of the notification method, notification must specify relevant technical details, including, at a minimum:
(i) The coordinates of the proposed repeater to an accuracy of no less than ±1 second latitude and longitude;
(ii) The proposed operating power(s), frequency band(s), and emission(s);
(iii) The antenna center height above ground and ground elevation above mean sea level, both to an accuracy of no less than ±1 meter;
(iv) The antenna gain pattern(s) in the azimuth and elevation planes that include the peak of the main beam; and
(v) The antenna downtilt angle(s).
(3) An SDARS licensee operating terrestrial repeaters must maintain an accurate and up-to-date inventory of its terrestrial repeaters operating above 2 watts average EIRP, including the information set forth in § 25.263(c)(2), which shall be available upon request by the Commission.
(d) Calculation of Notice Period. Notice periods are calculated from the date of receipt by the licensee being notified. If notification is by mail, the date of receipt is evidenced by the return receipt on certified mail. If notification is by fax, the date of receipt is evidenced by the notifying party's fax transmission confirmation log. If notification is by e-mail, the date of receipt is evidenced by a return e-mail receipt. If the SDARS licensee and all potentially affected WCS licensees reach a mutual agreement to provide notification by some other means, that agreement must specify the method for determining the beginning of the notice period.
(e) Duty to cooperate. SDARS licensees must cooperate in good faith in the selection and use of new repeater sites to reduce interference and make the most effective use of the authorized facilities. Licensees of stations suffering or causing harmful interference must cooperate in good faith and resolve such problems by mutually satisfactory arrangements. If the licensees are unable to do so, the International Bureau, in consultation with the Office of Engineering and Technology and the Wireless Telecommunications Bureau, may impose restrictions on SDARS licensees, including specifying the transmitter power, antenna height, or area or hours of operation of the stations.
[75 FR 45069, Aug. 2, 2010]

Title 47 published on 2013-10-01

The following are only the Rules published in the Federal Register after the published date of Title 47.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-09-03; vol. 79 # 170 - Wednesday, September 3, 2014
    1. 79 FR 52224 - Rules Governing the Licensing of, and Spectrum Usage by, Commercial Earth Stations and Space Stations
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Final rule; announcement of effective date.
      47 CFR 25.170, 25.171, 25.172, 25.173, 25.285, 25.286, and 25.287, and the amendments to 47 CFR 25.103, 25.111, 25.112, 25.113, 25.114, 25.115, 25.118, 25.121, 25.129, 25.130, 25.131, 25.132, 25.133, 25.134, 25.135, 25.136, 25.138, 25.140, 25.142, 25.143, 25.144, 25.145, 25.146, 25.153, 25.154, 25.161, 25.164, 25.201, 25.202, 25.203, 25.204, 25.206, 25.208, 25.209, 25.210, 25.211, 25.212, 25.214, 25.215, 25.217, 25.218, 25.220, 25.221, 25.222, 25.223, 25.226, 25.227, 25.259, 25.260, 25.271, 25.272, 25.276, and 25.281 published February 12, 2014 (79 FR 8308) are effective September 3, 2014. The incorporation by reference of certain publications listed in 47 CFR 25.281 is approved by the Director of the Federal Register as of September 3, 2014.
      47 CFR Part 25

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 47 published on 2013-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR 25 after this date.

  • 2014-12-03; vol. 79 # 232 - Wednesday, December 3, 2014
    1. 79 FR 71714 - Comprehensive Review of Licensing and Operating Rules for Satellite Services
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Proposed rule; extension of comment and reply comment period.
      Comments must be received on or before January 29, 2015. Reply comments must be received on or before March 2, 2015.
      47 CFR Part 25