47 CFR 27.1255 - Relocation Criteria for Broadband Radio Service Licensees in the 2150-2160/62 MHz band.

Status message

There are 16 Updates appearing in the Federal Register for 47 CFR 27. View below or at eCFR (GPOAccess)
prev | next
§ 27.1255 Relocation Criteria for Broadband Radio Service Licensees in the 2150-2160/62 MHz band.
(a) An AWS licensee in the 2150-2160/62 MHz band, prior to initiating operations from any base or fixed station that is co-channel to the 2150-2160/62 MHz band, must relocate any incumbent BRS system that is within the line of sight of the AWS licensee's base or fixed station. For purposes of this section, a determination of whether an AWS facility is within the line of sight of a BRS system will be made as follows:
(1) For a BRS system using the 2150-2160/62 MHz band exclusively to provide one-way transmissions to subscribers, the AWS licensee will determine whether there is an unobstructed signal path (line of sight) to the incumbent licensee's geographic service area (GSA), based on the following criteria: use of 9.1 meters (30 feet) for the receiving antenna height, use of the actual transmitting antenna height and terrain elevation, and assumption of 4/3 Earth radius propagation conditions. Terrain elevation data must be obtained from the U.S. Geological Survey (USGS) 3-second database. All coordinates used in carrying out the required analysis shall be based upon use of NAD-83.
(2) For all other BRS systems using the 2150-2160/62 MHz band, the AWS licensee will determine whether there is an unobstructed signal path (line of sight) to the incumbent licensee's receive station hub using the method prescribed in “Methods for Predicting Interference from Response Station Transmitters and to Response Station Hubs and for Supplying Data on Response Station Systems. MM Docket 97-217,” in Amendment of Parts 1, 21 and 74 to Enable Multipoint Distribution Service and Instructional Television Fixed Service Licensees to Engage in Fixed Two-Way Transmissions, MM Docket No. 97-217, Report and Order on Further Reconsideration and Further Notice of Proposed Rulemaking, 15 FCC Rcd 14566 at 14610, Appendix D.
(b) Any AWS licensee in the 2110-2180 MHz band that causes actual and demonstrable interference to a BRS licensee in the 2150-2160/62 MHz band must take steps to eliminate the harmful interference, up to and including relocation of the BRS licensee, regardless of whether it would be required to do so under paragraph (a), of this section.

Title 47 published on 2013-10-01

The following are only the Rules published in the Federal Register after the published date of Title 47.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2014-11-06; vol. 79 # 215 - Thursday, November 6, 2014
    1. 79 FR 65906 - Expanding the Economic and Innovation Opportunities of Spectrum Through Incentive Auctions
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Clarification.
      Effective November 6, 2014.
      47 CFR Parts 0, 1, 2, 15, 27, 73, and 74

Title 47 published on 2013-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR 27 after this date.

  • 2014-11-14; vol. 79 # 220 - Friday, November 14, 2014
    1. 79 FR 68172 - Updating Competitive Bidding Rules; Expanding the Economic and Innovation Opportunities of Spectrum Through Incentive Auctions; Implementation of the Commercial Spectrum Enhancement Act
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Proposed rule.
      Comments are due on or before December 29, 2014 and reply comments are due on or before January 20, 2015.
      47 CFR Parts 1 and 27