49 CFR 213.121 - Rail joints.

There is 1 rule appearing in the Federal Register for 49 CFR 213. Select the tab below to view, or View eCFR (GPOAccess)
§ 213.121
Rail joints.
(a) Each rail joint, insulated joint, and compromise joint shall be of a structurally sound design and dimensions for the rail on which it is applied.
(b) If a joint bar on Classes 3 through 5 track is cracked, broken, or because of wear allows excessive vertical movement of either rail when all bolts are tight, it shall be replaced.
(c) If a joint bar is cracked or broken between the middle two bolt holes it shall be replaced.
(d) In the case of conventional jointed track, each rail shall be bolted with at least two bolts at each joint in Classes 2 through 5 track, and with at least one bolt in Class 1 track.
(e) In the case of continuous welded rail track, each rail shall be bolted with at least two bolts at each joint.
(f) Each joint bar shall be held in position by track bolts tightened to allow the joint bar to firmly support the abutting rail ends and to allow longitudinal movement of the rail in the joint to accommodate expansion and contraction due to temperature variations. When no-slip, joint-to-rail contact exists by design, the requirements of this paragraph do not apply. Those locations when over 400 feet in length, are considered to be continuous welded rail track and shall meet all the requirements for continuous welded rail track prescribed in this part.
(g) No rail shall have a bolt hole which is torch cut or burned in Classes 2 through 5 track. For Class 2 track, this paragraph (g) is applicable September 21, 1999.
(h) No joint bar shall be reconfigured by torch cutting in Classes 3 through 5 track.

Title 49 published on 2012-10-01

The following are only the Rules published in the Federal Register after the published date of Title 49.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2013-03-13; vol. 78 # 49 - Wednesday, March 13, 2013
    1. 78 FR 16052 - Vehicle/Track Interaction Safety Standards; High-Speed and High Cant Deficiency Operations
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Federal Railroad Administration
      Final rule.
      This final rule is effective July 11, 2013. The incorporation by reference of a certain publication listed in the rule is approved by the Director of the Federal Register as of July 11, 2013. Petitions for reconsideration must be received on or before May 13, 2013. Comments in response to petitions for reconsideration must be received on or before June 26, 2013.
      49 CFR Parts 213 and 238

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
USC : Title 28 - JUDICIARY AND JUDICIAL PROCEDURE

§ 2461 note - Mode of recovery

USC : Title 49 - TRANSPORTATION

§ 20102 - Definitions

§ 20103 - General authority

§ 20104 - Emergency authority

§ 20105 - State participation

§ 20106 - Preemption

§ 20107 - Inspection and investigation

§ 20108 - Research, development, testing, and training

§ 20109 - Employee protections

§ 20110 - Effect on employee qualifications and collective bargaining

§ 20111 - Enforcement by the Secretary of Transportation

§ 20112 - Enforcement by the Attorney General

§ 20113 - Enforcement by the States

§ 20114 - Judicial procedures

§ 20142 - Track safety

Title 49 published on 2012-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 49 CFR 213 after this date.

  • 2013-03-13; vol. 78 # 49 - Wednesday, March 13, 2013
    1. 78 FR 16052 - Vehicle/Track Interaction Safety Standards; High-Speed and High Cant Deficiency Operations
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Federal Railroad Administration
      Final rule.
      This final rule is effective July 11, 2013. The incorporation by reference of a certain publication listed in the rule is approved by the Director of the Federal Register as of July 11, 2013. Petitions for reconsideration must be received on or before May 13, 2013. Comments in response to petitions for reconsideration must be received on or before June 26, 2013.
      49 CFR Parts 213 and 238