49 CFR 236 - RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES
- SUBPART A — Rules and Instructions: All Systems (§§ 236.1 - 236.110)
- SUBPART B — Automatic Block Signal Systems (§§ 236.201 - 236.207)
- SUBPART C — Interlocking (§§ 236.301 - 236.387)
- SUBPART D — Traffic Control Systems (§§ 236.401 - 236.476)
- SUBPART E — Automatic Train Stop, Train Control and Cab Signal Systems (§§ 236.501 - 236.590)
- SUBPART F — Dragging Equipment and Slide Detectors and Other Similar Protective Devices (§§ 236.601 - 236.601)
- SUBPART G — Definitions (§§ 236.700 - 236.838)
- SUBPART H — Standards for Processor-Based Signal and Train Control Systems (§§ 236.901 - 236.929)
- SUBPART I — Positive Train Control Systems (§§ 236.1001 - 236.1049)
- Appendix A to Part 236 - Civil Penalties 1
- Appendix B to Part 236 - Risk Assessment Criteria
- Appendix C to Part 236 - Safety Assurance Criteria and Processes
- Appendix D to Part 236 - Independent Review of Verification and Validation
- Appendix E to Part 236 - Human-Machine Interface (HMI) Design
- Appendix F to Part 236 - Minimum Requirements of FRA Directed Independent Third-Party Assessment of PTC System Safety Verification and Validation
Title 49 published on 2012-10-01
no entries appear in the Federal Register after this date.
This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.
This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].
It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.
Title 49 published on 2012-10-01
The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 49 CFR 236 after this date.
GPO FDSys XML | Text type regulations.gov FR Doc. 2013-01596 RIN 2130-AC32 Docket No. FRA-2011-0061, Notice No. 2 DEPARTMENT OF TRANSPORTATION, Federal Railroad Administration Clarification of NPRM and extension of comment period. Written comments must be received by March 11, 2013. Comments received after that date will be considered to the extent possible without incurring additional expenses or delays. 49 CFR Parts 234, 235, and 236 In response to a petition for rulemaking, FRA proposed, in a notice of proposed rulemaking (NPRM) dated December 11, 2012, amendments to regulations implementing a requirement of the Rail Safety Improvement Act of 2008 that certain passenger and freight railroads install positive train control (PTC) systems. The present document clarifies FRA's responses to several elements of the Association of American Railroads' (AAR) petition for rulemaking and which elements of the petition for rulemaking FRA is considering, and asks specific questions concerning those elements. This document does not alter FRA's proposal as issued December 11, 2012, but it does extend the comment period in this proceeding to March 11, 2013.
GPO FDSys XML | Text type regulations.gov FR Doc. 2012-29334 RIN 2130-AC32 Docket No. FRA-2011-0061, Notice No. 1 DEPARTMENT OF TRANSPORTATION, Federal Railroad Administration Notice of proposed rulemaking. Comments: Written comments must be received by February 11, 2013. Comments received after that date will be considered to the extent possible without incurring additional expenses or delays. Hearing: FRA anticipates being able to resolve this rulemaking without a public hearing. However, if prior to January 10, 2013, FRA receives a specific request for a public hearing, a hearing will be scheduled and FRA will publish a supplemental notice in the Federal Register to inform interested parties of the date, time, and location of such hearing. 49 CFR Parts 234, 235, and 236 FRA proposes amendments to regulations implementing a requirement of the Rail Safety Improvement Act of 2008 that certain passenger and freight railroads install positive train control (PTC) systems. The proposal would revise the regulatory provisions related to the de minimis exception to the installation of PTC systems generally, and more specifically, its application to yard-related movements. The proposal would also revise the existing regulations related to en route failures of a PTC system and discontinuances of signal systems once a PTC system is installed and make additional technical amendments to regulations governing grade crossing warning systems and signal systems, including PTC systems.
- Appendix A to Part 236 - Civil Penalties 1
- Appendix B to Part 236 - Risk Assessment Criteria
- Appendix C to Part 236 - Safety Assurance Criteria and Processes
- Appendix D to Part 236 - Independent Review of Verification and Validation
- Appendix E to Part 236 - Human-Machine Interface (HMI) Design
- Appendix F to Part 236 - Minimum Requirements of FRA Directed Independent Third-Party Assessment of PTC System Safety Verification and Validation