7 CFR 4280.115 - RES and EEI grant funding.

§ 4280.115 RES and EEI grant funding.
(a) The amount of grant funds that will be made available to an eligible RES or EEI project under this subpart will not exceed 25 percent of total eligible project costs. Eligible project costs are specified in paragraph (c) of this section.
(b) The applicant is responsible for securing the remainder of the total eligible project costs not covered by grant funds. The amount secured by the applicant must be the remainder of total eligible project costs.
(1) Without specific statutory authority, other Federal grant funds cannot be used to meet the matching fund requirement.
(2) Passive third-party equity contributions are acceptable for renewable energy system projects, including those that are eligible for Federal production tax credits, provided the applicant meets the requirements of § 4280.112.
(c) Eligible project costs are only those costs associated with the items identified in paragraphs (c)(1) through (c)(10) of this section, as long as the items are an integral and necessary part of the renewable energy system or energy efficiency improvement.
(1) Post-application purchase and installation of equipment (new, refurbished, or remanufactured), except agricultural tillage equipment, used equipment, and vehicles.
(2) Post-application construction or improvements, except residential.
(3) Energy audits or assessments.
(4) Permit and license fees.
(5) Professional service fees, except for application preparation.
(6) Feasibility studies and Technical reports.
(7) Business plans.
(8) Retrofitting.
(9) Construction of a new energy efficient facility only when the facility is used for the same purpose, is approximately the same size, and, based on the energy assessment or audit, will provide more energy savings than improving an existing facility. Only costs identified in the energy assessment or audit for energy efficiency improvements are allowed.
(10) Energy efficiency improvements are limited to only improvements identified in the energy assessment or audit. Equipment identified by the assessment or audit to be replaced shall be replaced with equipment similar in capacity. If the energy efficiency improvement has a greater capacity than the existing equipment, the Agency will pro-rate the energy efficiency improvement's total eligible project costs based on the capacity of the existing equipment. A calculation shall be performed by dividing the capacity of the existing equipment by the capacity of the proposed equipment to determine the percentage of the energy efficiency improvement's eligible project costs that the Agency will use in determining the maximum grant assistance under this subpart (see example).
Example. A business plans to build a new production line with a capacity of 625 units per hour to replace an existing production line that produces 500 units per hour. The total project costs of the new production line is $20,000, of which $15,000 would otherwise qualify as eligible project costs. However, because the new production line has a greater production capacity than the existing line (625 units per hour versus 500 units per hour), only a portion of the $15,000 of otherwise eligible project costs would be used in determining total eligible project cost and the maximum grant assistance available. In this example, because the original capacity (500 units per hour) is 80 percent of the new capacity (625 units per hour), only 80 percent of the $15,000 of otherwise eligible project costs associated with the new production line (i.e., $12,000) will be considered as total eligible project cost to be financed under this subpart. The maximum grant award in this example would be $3,000, which is equal to $12,000 × 25 percent.
(d) The maximum amount of grant assistance to one individual or entity will not exceed $750,000 per Federal fiscal year. For those applicants that have not received a grant award during the previous 2 Federal fiscal years, additional points will be added to their priority score.
(e) Applications for renewable energy system grants will be accepted for a minimum grant request of $2,500 up to a maximum of $500,000.
(f) Applications for energy efficiency improvement grants will be accepted for a minimum grant request of $1,500 up to a maximum of $250,000.
(g) In determining the amount of a RES or EEI grant awarded, the Agency will take into consideration the following six criteria:
(1) The type of renewable energy system to be purchased;
(2) The estimated quantity of energy to be generated by the renewable energy system;
(3) The expected environmental benefits of the renewable energy system;
(4) The quantity of energy savings expected to be derived from the activity, as demonstrated by an energy audit;
(5) The estimated period of time for the energy savings generated by the activity to equal the cost of the activity; and
(6) The expected energy efficiency of the renewable energy system.
(h) Time limit. Unless otherwise agreed to by the Agency, any renewable energy system or energy efficiency improvement grant agreement under this subpart will terminate 2 years from the date the Agency signs the agreement.

Title 7 published on 2014-01-01

no entries appear in the Federal Register after this date.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 7 published on 2014-01-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 7 CFR 4280 after this date.

  • 2014-04-02; vol. 79 # 63 - Wednesday, April 2, 2014
    1. 79 FR 18482 - Environmental Policies and Procedures
      GPO FDSys XML | Text
      DEPARTMENT OF AGRICULTURE, Rural Business-Cooperative Service, Rural Utilities Service, Rural Housing Service, Farm Service Agency
      Proposed rule; extension of public comment period.
      Comments on the proposed rule must be received on or before May 7, 2014.
      7 CFR Parts 1703, 1709, 1710, 1717, 1720, 1721, 1724, 1726, 1737, 1738, 1739, 1740, 1753, 1774, 1775, 1779, 1780, 1781, and 1782