16 U.S. Code § 825s–1 - Southwestern area sale and transmission of electric power; disposition of receipts; creation of continuing fund; use of fund

All receipts from the transmission and sale of electric power and energy under the provisions of section 825s of this title, generated or purchased in the southwestern power area, shall be covered into the Treasury of the United States as miscellaneous receipts, except that the Treasury shall set up and maintain from such receipts a continuing fund of $300,000, including the sum of $100,000 in the continuing fund established under the Administrator of the Southwestern Power Administration in the First Supplemental National Defense Appropriation Act, 1944 (57 Stat. 621), which shall be transferred to the fund established; and said fund of $300,000 shall be placed to the credit of the Secretary and shall be subject to check by him to defray emergency expenses necessary to insure continuity of electric service and continuous operation of the facilities, and to cover all costs in connection with the purchase of electric power and energy and rentals for the use of facilities for the transmission and distribution of electric power and energy to public bodies, cooperatives, and privately owned companies: Provided, That expenditures from this fund to cover such costs in connection with the purchase of electric power and energy and rentals for the use of facilities are to be made only in such amounts as may be approved annually in appropriation Acts.

Source

(Oct. 12, 1949, ch. 680, title I, § 101,63 Stat. 767; Aug. 31, 1951, ch. 375, title I, § 101,65 Stat. 249.)
References in Text

The First Supplemental National Defense Appropriation Act, 1944, referred to in text, was act Dec. 23, 1943, ch. 380, title I, § 101,57 Stat. 621, which was not classified to the Code.
Codification

Section was not enacted as part of the Federal Power Act which generally comprises this chapter.
Section as originally enacted contained a provision relating to maximum expenditures for the fiscal year 1952.
Amendments

1951—Act Aug. 31, 1951, inserted proviso.
Use of Fund To Pay for Purchase Power and Wheeling Expenses To Meet Contractual Obligations During Periods of Below-Average Hydropower Generation

Pub. L. 101–101, title III, Sept. 29, 1989, 103 Stat. 660, provided: “That the continuing fund established by the Act of October 12, 1949, c. 680, title I, section 101, as amended [16 U.S.C. 825s–1], shall also be available on an ongoing basis for paying for purchase power and wheeling expenses when the Administrator determines that such expenditures are necessary to meet contractual obligations for the sale and delivery of power during periods of below-average hydropower generation. Payments from the continuing fund shall be limited to the amount required to replace the generation deficiency, and only for the project where the deficiency occurred. Replenishment of the fund shall occur within twelve months of the month in which the funds were first expended.”

This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


18 CFR - Conservation of Power and Water Resources

18 CFR Part 1b - RULES RELATING TO INVESTIGATIONS

18 CFR Part 2 - GENERAL POLICY AND INTERPRETATIONS

18 CFR Part 3 - [Reserved]

18 CFR Part 5 - INTEGRATED LICENSE APPLICATION PROCESS

18 CFR Part 11 - ANNUAL CHARGES UNDER PART I OF THE FEDERAL POWER ACT

18 CFR Part 12 - SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS

18 CFR Part 46 - PUBLIC UTILITY FILING REQUIREMENTS AND FILING REQUIREMENTS FOR PERSONS HOLDING INTERLOCKING POSITIONS

18 CFR Part 131 - FORMS

18 CFR Part 141 - STATEMENTS AND REPORTS (SCHEDULES)

18 CFR Part 154 - RATE SCHEDULES AND TARIFFS

18 CFR Part 225 - PRESERVATION OF RECORDS OF NATURAL GAS COMPANIES

18 CFR Part 260 - STATEMENTS AND REPORTS (SCHEDULES)

18 CFR Part 290 - COLLECTION OF COST OF SERVICE INFORMATION UNDER SECTION 133 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978

18 CFR Part 294 - PROCEDURES FOR SHORTAGES OF ELECTRIC ENERGY AND CAPACITY UNDER SECTION 206 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978

18 CFR Part 381 - FEES

18 CFR Part 385 - RULES OF PRACTICE AND PROCEDURE

 

LII has no control over and does not endorse any external Internet site that contains links to or references LII.