16 U.S. Code § 832c - Distribution of electricity; preference to public bodies and cooperatives

(a) General provisions
In order to insure that the facilities for the generation of electric energy at the Bonneville project shall be operated for the benefit of the general public, and particularly of domestic and rural consumers, the administrator shall at all times, in disposing of electric energy generated at said project, give preference and priority to public bodies and cooperatives.
(b) Prior to January 1, 1942; subsequent thereto
To preserve and protect the preferential rights and priorities of public bodies and cooperatives as provided in subsection (a) of this section and to effectuate the intent and purpose of this chapter that at all times up to January 1, 1942, there shall be available for sale to public bodies and cooperatives not less than 50 per centum of the electric energy produced at the Bonneville project, it shall be the duty of the administrator in making contracts for the sale of such energy to so arrange such contracts as to make such 50 per centum of such energy available to said public bodies and cooperatives until January 1, 1942: Provided, That the electric energy so reserved for but not actually purchased by and delivered to such public bodies and cooperatives prior to January 1, 1942, may be disposed of temporarily so long as such temporary disposition will not interfere with the purchase by and delivery to such public bodies and cooperatives at any time prior to January 1, 1942: Provided further, That nothing herein contained shall be construed to limit or impair the preferential and priority rights of such public bodies or cooperatives after January 1, 1942; and in the event that after such date there shall be conflicting or competing applications for an allocation of electric energy between any public body or cooperative on the one hand and a private agency of any character on the other, the application of such public body or cooperative shall be granted.
(c) Allowance of time for financing
An application by any public body or cooperative for an allocation of electric energy shall not be denied, or another application competing or in conflict therewith be granted, to any private corporation, company, agency, or person, on the ground that any proposed bond or other security issue of any such public body or cooperative, the sale of which is necessary to enable such prospective purchaser to enter into the public business of selling and distributing the electric energy proposed to be purchased, has not been authorized or marketed, until after a reasonable time, to be determined by the administrator, has been afforded such public body or cooperative to have such bond or other security issue authorized or marketed.
(d) Congressional declaration of policy; allowance of time for creation and organization
It is declared to be the policy of the Congress, as expressed in this chapter, to preserve the said preferential status of the public bodies and cooperatives herein referred to, and to give to the people of the States within economic transmission distance of the Bonneville project reasonable opportunity and time to hold any election or elections or take any action necessary to create such public bodies and cooperatives as the laws of such States authorize and permit, and to afford such public bodies or cooperatives reasonable time and opportunity to take any action necessary to authorize the issuance of bonds or to arrange other financing necessary to construct or acquire necessary and desirable electric distribution facilities, and in all other respects legally to become qualified purchasers and distributors of electric energy available under this chapter.

Source

(Aug. 20, 1937, ch. 720, § 4,50 Stat. 733; Mar. 6, 1940, ch. 47, § 3,54 Stat. 47.)
Amendments

1940—Subsec. (b). Act Mar. 6, 1940, substituted “January 1, 1942” for “January 1, 1941” wherever appearing.
Transfer of Functions

Functions of Secretary of the Interior with respect to Bonneville Power Administration transferred to Secretary of Energy by section 7152 (a)(1)(D), (2) of Title 42, The Public Health and Welfare, with Bonneville Power Administration to be preserved as a distinct organizational entity within Department of Energy and headed by an Administrator.

The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.

The most recent Classification Table update that we have noticed was Tuesday, August 13, 2013

An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.

16 USCDescription of ChangeSession YearPublic LawStatutes at Large

This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


18 CFR - Conservation of Power and Water Resources

18 CFR Part 300 - CONFIRMATION AND APPROVAL OF THE RATES OF FEDERAL POWER MARKETING ADMINISTRATIONS

 

LII has no control over and does not endorse any external Internet site that contains links to or references LII.