33 U.S. Code § 2288 - Review of cost effectiveness of design

During the design of each water resources project which has a total cost in excess of $10,000,000, which is authorized before, on, or after November 17, 1986, and undertaken by the Secretary, and on which construction has not been initiated as of November 17, 1986, the Secretary shall require a review of the cost effectiveness of such design. The review shall employ cost control techniques which will ensure that such project is designed in the most cost-effective way for the life of the project.

Source

(Pub. L. 99–662, title IX, § 911,Nov. 17, 1986, 100 Stat. 4189.)

The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.

The most recent Classification Table update that we have noticed was Tuesday, August 13, 2013

An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.

33 USCDescription of ChangeSession YearPublic LawStatutes at Large

 

LII has no control over and does not endorse any external Internet site that contains links to or references LII.