(a) Construction of deep-water navigation works in Saint Lawrence River; conditions precedent
The Corporation is authorized and directed to construct, in United States territory, deep-water navigation works substantially in accordance with the “Controlled single stage project, 238–242” (with a controlling depth of twenty-seven feet in channels and canals and locks at least eight hundred feet long, eighty feet wide, and thirty feet over the sills), designated as “works solely for navigation” in the joint report dated January 3, 1941, of the Canadian Temporary Great Lakes-Saint Lawrence Basin Committee and the United States Saint Lawrence Advisory Committee, in the International Rapids section of the Saint Lawrence River together with necessary dredging in the Thousand Islands section; and to operate and maintain such works in coordination with the Saint Lawrence Seaway Authority of Canada, created by chapter 24 of the acts of the fifth session of the Twenty-first Parliament of Canada 15–16, George VI (assented to December 21, 1951): Provided, That the Corporation shall not proceed with the aforesaid construction unless and until—
(1)the Saint Lawrence Seaway Authority of Canada, provides assurances satisfactory to the Corporation that it will complete the Canadian portions of the navigation works authorized by section
10, chapter 24section
10, chapter 24 of the acts of the fifth session of the Twenty-first Parliament of Canada 15–16, George VI, 1951, as nearly as possible concurrently with the completion of the works authorized by this section;
(2)the Corporation has received assurances satisfactory to it that the State of New York, or an entity duly designated by it, or other licensee of the Federal Energy Regulatory Commission, in conjunction with an appropriate agency in Canada, as nearly as possible concurrently with the navigation works herein authorized, will construct and complete the dams and power works approved by the International Joint Commission in its order of October 29, 1952 (docket 68) or any amendment or modification thereof.
(b) Coordination of activities regarding power projects
The Corporation shall make necessary arrangements to assure the coordination of its activities with those of the Saint Lawrence Seaway Authority of Canada and the entity designated by the State of New York, or other licensee of the Federal Energy Regulatory Commission, authorized to construct and operate the dams and power works authorized by the International Joint Commission in its order of October 29, 1952 (docket 68) or any amendment or modification thereof.
(a) Construction of deep-water navigation works in Saint Lawrence River; conditions precedent
The Corporation is authorized and directed to construct, in United States territory, deep-water navigation works substantially in accordance with the “Controlled single stage project, 238–242” (with a controlling depth of twenty-seven feet in channels and canals and locks at least eight hundred feet long, eighty feet wide, and thirty feet over the sills), designated as “works solely for navigation” in the joint report dated January 3, 1941, of the Canadian Temporary Great Lakes-Saint Lawrence Basin Committee and the United States Saint Lawrence Advisory Committee, in the International Rapids section of the Saint Lawrence River together with necessary dredging in the Thousand Islands section; and to operate and maintain such works in coordination with the Saint Lawrence Seaway Authority of Canada, created by chapter 24 of the acts of the fifth session of the Twenty-first Parliament of Canada 15–16, George VI (assented to December 21, 1951): Provided, That the Corporation shall not proceed with the aforesaid construction unless and until—
(1)the Saint Lawrence Seaway Authority of Canada, provides assurances satisfactory to the Corporation that it will complete the Canadian portions of the navigation works authorized by section
10, chapter 24section
10, chapter 24 of the acts of the fifth session of the Twenty-first Parliament of Canada 15–16, George VI, 1951, as nearly as possible concurrently with the completion of the works authorized by this section;
(2)the Corporation has received assurances satisfactory to it that the State of New York, or an entity duly designated by it, or other licensee of the Federal Energy Regulatory Commission, in conjunction with an appropriate agency in Canada, as nearly as possible concurrently with the navigation works herein authorized, will construct and complete the dams and power works approved by the International Joint Commission in its order of October 29, 1952 (docket 68) or any amendment or modification thereof.
(b) Coordination of activities regarding power projects
The Corporation shall make necessary arrangements to assure the coordination of its activities with those of the Saint Lawrence Seaway Authority of Canada and the entity designated by the State of New York, or other licensee of the Federal Energy Regulatory Commission, authorized to construct and operate the dams and power works authorized by the International Joint Commission in its order of October 29, 1952 (docket 68) or any amendment or modification thereof.
“Federal Energy Regulatory Commission” substituted for “Federal Power Commission” in subsecs. (a)(2) and (b), on authority of Pub. L. 95–91, title IV, § 402(a)(1)(A),Aug. 4, 1977, 91 Stat. 583, which is classified to section
7172(a)(1)(A) of Title
42, The Public Health and Welfare.
The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.
The most recent Classification Table update that we have noticed was Monday, June 17, 2013
An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.
33 USC
Description of Change
Session Year
Public Law
Statutes at Large
This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.
It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.
LII has no control over and does not endorse any external Internet site that contains links to or references LII.