42 USC § 16320 - Spallation Neutron Source
(a)
Definitions
In this section:
(1)
SING
The term “SING” means the Spallation Neutron Source Instruments Next Generation major item of equipment.
(2)
SNS power upgrade
The term “SNS power upgrade” means the Spallation Neutron Source power upgrade described in the 20-year facilities plan of the Office of Science of the Department.
(3)
SNS second target station
The term “SNS second target station” means the Spallation Neutron Source second target station described in the 20-year facilities plan of the Office of Science of the Department.
(b)
Spallation Neutron Source Project
(c)
Spallation Neutron Source Facility plan
(1)
In general
The Secretary shall develop an operational plan for the Spallation Neutron Source Facility that ensures that the Facility is employed to the full capability of the Facility in support of the study of advanced materials, nanoscience, and other missions of the Office of Science of the Department.
(2)
Plan
The operational plan shall—
(A)
include a plan for the operation of an effective scientific user program that—
(B)
include an ongoing program to develop new instruments that builds on the high performance neutron source and that allows neutron scattering techniques to be applied to a growing range of scientific problems and disciplines; and
(d)
Authorization of appropriations
(1)
Spallation Neutron Source Project
There is authorized to be appropriated to carry out the Spallation Neutron Source Project for the lifetime of the Project $1,411,700,000 for total project costs, of which—
(a)
Definitions
In this section:
(1)
SING
The term “SING” means the Spallation Neutron Source Instruments Next Generation major item of equipment.
(2)
SNS power upgrade
The term “SNS power upgrade” means the Spallation Neutron Source power upgrade described in the 20-year facilities plan of the Office of Science of the Department.
(3)
SNS second target station
The term “SNS second target station” means the Spallation Neutron Source second target station described in the 20-year facilities plan of the Office of Science of the Department.
(b)
Spallation Neutron Source Project
(c)
Spallation Neutron Source Facility plan
(1)
In general
The Secretary shall develop an operational plan for the Spallation Neutron Source Facility that ensures that the Facility is employed to the full capability of the Facility in support of the study of advanced materials, nanoscience, and other missions of the Office of Science of the Department.
(2)
Plan
The operational plan shall—
(A)
include a plan for the operation of an effective scientific user program that—
(B)
include an ongoing program to develop new instruments that builds on the high performance neutron source and that allows neutron scattering techniques to be applied to a growing range of scientific problems and disciplines; and
(d)
Authorization of appropriations
(1)
Spallation Neutron Source Project
There is authorized to be appropriated to carry out the Spallation Neutron Source Project for the lifetime of the Project $1,411,700,000 for total project costs, of which—
Source
(Pub. L. 109–58, title IX, § 980,Aug. 8, 2005, 119 Stat. 905.)
The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.
The most recent Classification Table update that we have noticed was Tuesday, May 21, 2013
An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.
| 42 USC | Description of Change | Session Year | Public Law | Statutes at Large |
|---|
LII has no control over and does not endorse any external Internet site that contains links to or references LII.