Skip to main content
 

42 USC § 18313 - Assurance of core capabilities

There is 1 Update Pending. Select the tab below to view.

USCPrelim is a preliminary release and may be subject to further revision before it is released again as a final version.

Current through Pub. L. 112-238. (See Public Laws for the current Congress.)

(a) Sense of Congress
It is the sense of Congress that—
(1) the ISS, technology developments, the current Space Shuttle program, and follow-on transportation systems authorized by this chapter form the foundation of initial capabilities for missions beyond low-Earth orbit to a variety of lunar and Lagrangian orbital locations; and
(2) these initial missions and related capabilities should be utilized to provide operational experience, technology development, and the placement and assured use of in-space infrastructure and in-space servicing of existing and future assets.
(b) Space Shuttle capability assurance
(1) Development of follow-on space transportation systems
The Administrator shall proceed with the development of follow-on space transportation systems in a manner that ensures that the national capability to restart and fly Space Shuttle missions can be initiated if required by the Congress, in an Act enacted after October 11, 2010, or by a Presidential determination transmitted to the Congress, before the last Space Shuttle mission authorized by this chapter is completed.
(2) Required actions
In carrying out the requirement in paragraph (1), the Administrator shall authorize refurbishment of the manufactured external tank of the Space Shuttle, designated as ET–94, and take all actions necessary to enable its readiness for use in the Space Launch System development as a critical skills and capability retention effort or for test purposes, while preserving the ability to use this tank if needed for an ISS contingency if deemed necessary under paragraph (1).
(c) Sense of Congress regarding human space flight capability assurance
It is the sense of Congress that the Administrator shall proceed with the utilization of the ISS, technology development, and follow-on transportation systems (including the Space Launch System, multi-purpose crew vehicle, and commercial crew and cargo transportation capabilities) under subchapters II and III of this chapter in a manner that ensures—
(1) that these capabilities remain inherently complementary and interrelated;
(2) a balance of the development, sustainment, and use of each of these capabilities, which are of critical importance to the viability and sustainability of the U.S. space program; and
(3) that resources required to support the timely and sustainable development of these capabilities authorized in either subchapter II or subchapter III of this chapter are not derived from a reduction in resources for the capabilities authorized in the other subchapter.
(d) Limitation
Nothing in subsection (c) shall apply to or affect any capability authorized by any other subchapter of this chapter  [1]


[1]  So in original. Probably should be followed by a period.

prev | next
(a) Sense of Congress
It is the sense of Congress that—
(1) the ISS, technology developments, the current Space Shuttle program, and follow-on transportation systems authorized by this chapter form the foundation of initial capabilities for missions beyond low-Earth orbit to a variety of lunar and Lagrangian orbital locations; and
(2) these initial missions and related capabilities should be utilized to provide operational experience, technology development, and the placement and assured use of in-space infrastructure and in-space servicing of existing and future assets.
(b) Space Shuttle capability assurance
(1) Development of follow-on space transportation systems
The Administrator shall proceed with the development of follow-on space transportation systems in a manner that ensures that the national capability to restart and fly Space Shuttle missions can be initiated if required by the Congress, in an Act enacted after October 11, 2010, or by a Presidential determination transmitted to the Congress, before the last Space Shuttle mission authorized by this chapter is completed.
(2) Required actions
In carrying out the requirement in paragraph (1), the Administrator shall authorize refurbishment of the manufactured external tank of the Space Shuttle, designated as ET–94, and take all actions necessary to enable its readiness for use in the Space Launch System development as a critical skills and capability retention effort or for test purposes, while preserving the ability to use this tank if needed for an ISS contingency if deemed necessary under paragraph (1).

Source

(Pub. L. 111–267, title II, § 203,Oct. 11, 2010, 124 Stat. 2812.)

The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.

The most recent Classification Table update that we have noticed was Friday, May 3, 2013

An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.

42 USCDescription of ChangeSession YearPublic LawStatutes at Large
§ 183132012112-273 [Sec.] 2126 Stat. 2454

This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


LII has no control over and does not endorse any external Internet site that contains links to or references LII.