42 USC § 18325 - NASA launch support and infrastructure modernization program
(a)
In general
The Administrator shall carry out a program the primary purpose of which is to prepare infrastructure at the Kennedy Space Center that is needed to enable processing and launch of the Space Launch System. Vehicle interfaces and other ground processing and payload integration areas should be simplified to minimize overall costs, enhance safety, and complement the purpose of this section.
(b)
Elements
The program required by this section shall include—
(1)
investments to improve civil and national security operations at the Kennedy Space Center, to enhance the overall capabilities of the Center, and to reduce the long term cost of operations and maintenance;
(c)
Report on NASA launch support and infrastructure modernization program
(1)
Report required
Not later than 120 days after October 11, 2010, the Administrator shall submit to the appropriate committees of Congress a report on the plan for the implementation of the NASA launch support and infrastructure modernization program.
(2)
Elements
The report required by this subsection shall include—
(A)
a description of the ground infrastructure plan tied to the Space Launch System and potential ground investment activities at other NASA centers related to supporting the development of the Space Launch System;
(a)
In general
The Administrator shall carry out a program the primary purpose of which is to prepare infrastructure at the Kennedy Space Center that is needed to enable processing and launch of the Space Launch System. Vehicle interfaces and other ground processing and payload integration areas should be simplified to minimize overall costs, enhance safety, and complement the purpose of this section.
(b)
Elements
The program required by this section shall include—
(1)
investments to improve civil and national security operations at the Kennedy Space Center, to enhance the overall capabilities of the Center, and to reduce the long term cost of operations and maintenance;
(c)
Report on NASA launch support and infrastructure modernization program
(1)
Report required
Not later than 120 days after October 11, 2010, the Administrator shall submit to the appropriate committees of Congress a report on the plan for the implementation of the NASA launch support and infrastructure modernization program.
(2)
Elements
The report required by this subsection shall include—
(A)
a description of the ground infrastructure plan tied to the Space Launch System and potential ground investment activities at other NASA centers related to supporting the development of the Space Launch System;
Source
(Pub. L. 111–267, title III, § 305,Oct. 11, 2010, 124 Stat. 2817.)
The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.
The most recent Classification Table update that we have noticed was Monday, June 17, 2013
An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.
| 42 USC | Description of Change | Session Year | Public Law | Statutes at Large |
|---|
LII has no control over and does not endorse any external Internet site that contains links to or references LII.