42 USC § 18353 - Maintenance of the United States segment and assurance of continued operations of the International Space Station.
(a)
In general
The Administrator shall take all actions necessary to ensure the safe and effective operation, maintenance, and maximum utilization of the United States segment of the ISS through at least September 30, 2020.
(b)
Vehicle and component review
(1)
In general
In carrying out subsection (a), the Administrator shall, as soon as is practicable after October 11, 2010, carry out a comprehensive assessment of the essential modules, operational systems and components, structural elements, and permanent scientific equipment on board or planned for delivery and installation aboard the ISS, including both United States and international partner elements, for purposes of identifying the spare or replacement modules, systems and components, elements, and equipment that are required to ensure complete, effective, and safe functioning and full scientific utilization of the ISS through September 30, 2020.
(c)
Reports
(1)
Report on assessment
(A)
Report required
Not later than 90 days after October 11, 2010, the Administrator shall submit to the appropriate committees of Congress a report on the assessment required by subsection (b).
(B)
Elements
The report required by this paragraph shall include, at minimum, the following:
(i)
A description of the spare or replacement modules, systems and components, elements, and equipment identified pursuant to the assessment that are currently produced, in inventory, or on order, a description of the state of their readiness, and a schedule for their delivery to the ISS (including the planned transportation means for such delivery), including for each such module, system or component, element, or equipment a description of—
(ii)
A description of the spare or replacement modules, systems and components, elements, and equipment identified pursuant to the assessment that are not currently produced, in inventory, or on order, including for each such module, system or component, element, or equipment a description of—
(iii)
A detailed summary of the delivery schedule and associated delivery vehicle requirements necessary to transport all spare and replacement elements considered essential for the ongoing and sustained functionality of all critical systems of the ISS, both in and of themselves and as an element of an integrated, mutually dependent essential capability, including an assessment of the current schedule for delivery, the availability of delivery vehicles to meet that schedule, and the likelihood of meeting that schedule through such vehicles.
(2)
GAO report
(A)
Report required
Not later than 90 days after the submittal to Congress under paragraph (1) of the assessment required by subsection (b), the Comptroller General of the United States shall submit to the appropriate committees of Congress a report on the assessment. The report shall set forth an evaluation of the assessment by the Comptroller General, including an evaluation of the accuracy and level of confidence in the findings of the assessment.
(d)
Utilization of research facilities and capabilities
Utilization of research facilities and capabilities aboard the ISS (other than exploration-related research and technology development facilities and capabilities, and associated ground support and logistics), shall be planned, managed, and supported as provided in section
18354 of this title. Exploration-related research and technology development facilities, capabilities, and associated ground support and logistics shall be planned, managed, and supported by the appropriate NASA organizations and officials in a manner that does not interfere with other activities under section
18354 of this title.
(e)
Space Shuttle mission to ISS
(1)
Space Shuttle mission
The Administrator shall fly the Launch-On-Need Shuttle mission currently designated in the Shuttle Flight Manifest dated February 28, 2010, to the ISS in fiscal year 2011, but no earlier than June 1, 2011, unless required earlier by an operations contingency, and pending the results of the assessment required by paragraph (2) and the determination under paragraph (3)(A).
(2)
Assessment of safe means of return
The Administrator shall provide for an assessment by the NASA Engineering and Safety Center of the procedures and plans developed to ensure the safety of the Space Shuttle crew, and alternative means of return, in the event the Space Shuttle is damaged or otherwise unable to return safely to Earth.
(f)
Space Shuttle manifest flight assurance
(1)
In general
The Administrator shall take all actions necessary to preserve Space Shuttle launch capability through fiscal year 2011 in a manner that enables the launch, at a minimum, of missions and primary payloads in the Shuttle flight manifest as of February 28, 2010.
[1] See References in Text note below.
(a)
In general
The Administrator shall take all actions necessary to ensure the safe and effective operation, maintenance, and maximum utilization of the United States segment of the ISS through at least September 30, 2020.
(b)
Vehicle and component review
(1)
In general
In carrying out subsection (a), the Administrator shall, as soon as is practicable after October 11, 2010, carry out a comprehensive assessment of the essential modules, operational systems and components, structural elements, and permanent scientific equipment on board or planned for delivery and installation aboard the ISS, including both United States and international partner elements, for purposes of identifying the spare or replacement modules, systems and components, elements, and equipment that are required to ensure complete, effective, and safe functioning and full scientific utilization of the ISS through September 30, 2020.
(c)
Reports
(1)
Report on assessment
(A)
Report required
Not later than 90 days after October 11, 2010, the Administrator shall submit to the appropriate committees of Congress a report on the assessment required by subsection (b).
(B)
Elements
The report required by this paragraph shall include, at minimum, the following:
(i)
A description of the spare or replacement modules, systems and components, elements, and equipment identified pursuant to the assessment that are currently produced, in inventory, or on order, a description of the state of their readiness, and a schedule for their delivery to the ISS (including the planned transportation means for such delivery), including for each such module, system or component, element, or equipment a description of—
(ii)
A description of the spare or replacement modules, systems and components, elements, and equipment identified pursuant to the assessment that are not currently produced, in inventory, or on order, including for each such module, system or component, element, or equipment a description of—
(iii)
A detailed summary of the delivery schedule and associated delivery vehicle requirements necessary to transport all spare and replacement elements considered essential for the ongoing and sustained functionality of all critical systems of the ISS, both in and of themselves and as an element of an integrated, mutually dependent essential capability, including an assessment of the current schedule for delivery, the availability of delivery vehicles to meet that schedule, and the likelihood of meeting that schedule through such vehicles.
(2)
GAO report
(A)
Report required
Not later than 90 days after the submittal to Congress under paragraph (1) of the assessment required by subsection (b), the Comptroller General of the United States shall submit to the appropriate committees of Congress a report on the assessment. The report shall set forth an evaluation of the assessment by the Comptroller General, including an evaluation of the accuracy and level of confidence in the findings of the assessment.
(d)
Utilization of research facilities and capabilities
Utilization of research facilities and capabilities aboard the ISS (other than exploration-related research and technology development facilities and capabilities, and associated ground support and logistics), shall be planned, managed, and supported as provided in section
18354 of this title. Exploration-related research and technology development facilities, capabilities, and associated ground support and logistics shall be planned, managed, and supported by the appropriate NASA organizations and officials in a manner that does not interfere with other activities under section
18354 of this title.
(e)
Space Shuttle mission to ISS
(1)
Space Shuttle mission
The Administrator shall fly the Launch-On-Need Shuttle mission currently designated in the Shuttle Flight Manifest dated February 28, 2010, to the ISS in fiscal year 2011, but no earlier than June 1, 2011, unless required earlier by an operations contingency, and pending the results of the assessment required by paragraph (2) and the determination under paragraph (3)(A).
(2)
Assessment of safe means of return
The Administrator shall provide for an assessment by the NASA Engineering and Safety Center of the procedures and plans developed to ensure the safety of the Space Shuttle crew, and alternative means of return, in the event the Space Shuttle is damaged or otherwise unable to return safely to Earth.
(f)
Space Shuttle manifest flight assurance
(1)
In general
The Administrator shall take all actions necessary to preserve Space Shuttle launch capability through fiscal year 2011 in a manner that enables the launch, at a minimum, of missions and primary payloads in the Shuttle flight manifest as of February 28, 2010.
[1] See References in Text note below.
Source
(Pub. L. 111–267, title V, § 503,Oct. 11, 2010, 124 Stat. 2823.)
References in Text
Section
101
(2)(B), referred to in subsec. (e)(4), is Pub. L. 111–267, title I, § 101(2)(B),Oct. 11, 2010, 124 Stat. 2809, which is not classified to the Code.
The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.
The most recent Classification Table update that we have noticed was Friday, May 3, 2013
An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.
| 42 USC | Description of Change | Session Year | Public Law | Statutes at Large |
|---|
LII has no control over and does not endorse any external Internet site that contains links to or references LII.