42 U.S. Code § 2204 - Electric utility contracts; authority to enter into; cancellation; submission to Energy Committees

The Commission is authorized in connection with the construction or operation of the Oak Ridge, Paducah, and Portsmouth installations of the Commission, without regard to sections 1341, 1342, and 1349–1351 andsubchapter II of chapter 15 of title 31, to enter into new contracts or modify or confirm existing contracts to provide for electric utility services for periods not exceeding twenty-five years, and such contracts shall be subject to termination by the Commission upon payment of cancellation costs as provided in such contracts, and any appropriation presently or hereafter made available to the Commission shall be available for the payment of such cancellation costs. Any such cancellation payments shall be taken into consideration in determination of the rate to be charged in the event the Commission or any other agency of the Federal Government shall purchase electric utility services from the contractor subsequent to the cancellation and during the life of the original contract. The authority of the Commission under this section to enter into new contracts or modify or confirm existing contracts to provide for electric utility services includes, in case such electric utility services are to be furnished to the Commission by the Tennessee Valley Authority, authority to contract with any person to furnish electric utility services to the Tennessee Valley Authority in replacement thereof. Any contract hereafter entered into by the Commission pursuant to this section shall be submitted to the Energy Committees and a period of thirty days shall elapse while Congress is in session (in computing such thirty days, there shall be excluded the days on which either House is not in session because of adjournment for more than three days) before the contract of the Commission shall become effective: Provided, however, That the Energy Committees, after having received the proposed contract, may by resolution in writing, waive the conditions of or all or any portion of such thirty-day period.

Source

(Aug. 1, 1946, ch. 724, title I, § 164, as added Aug. 30, 1954, ch. 1073, § 1,68 Stat. 951; renumbered title I, Pub. L. 102–486, title IX, § 902(a)(8),Oct. 24, 1992, 106 Stat. 2944; amended Pub. L. 103–437, § 15(f)(7),Nov. 2, 1994, 108 Stat. 4593.)
Codification

“Sections 1341, 1342, and 1349–1351 andsubchapter II of chapter 15 of title 31” substituted in text for “section 3679 of the Revised Statutes, as amended [31 U.S.C. 665]” on authority of Pub. L. 97–258, § 4(b),Sept. 13, 1982, 96 Stat. 1067, the first section of which enacted Title 31, Money and Finance.
Amendments

1994—Pub. L. 103–437substituted “Energy Committees” for “Joint Committee” in two places.

This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


40 CFR - Protection of Environment

40 CFR Part 191 - ENVIRONMENTAL RADIATION PROTECTION STANDARDS FOR MANAGEMENT AND DISPOSAL OF SPENT NUCLEAR FUEL, HIGH-LEVEL AND TRANSURANIC RADIOACTIVE WASTES

40 CFR Part 194 - CRITERIA FOR THE CERTIFICATION AND RE-CERTIFICATION OF THE WASTE ISOLATION PILOT PLANT'S COMPLIANCE WITH THE 40 CFR PART 191 DISPOSAL REGULATIONS

 

LII has no control over and does not endorse any external Internet site that contains links to or references LII.