42 U.S. Code § 6966 - Increased use of recovered mineral component in federally funded projects involving procurement of cement or concrete

(a) Definitions
In this section:
(1) Agency head
The term “agency head” means—
(A) the Secretary of Transportation; and
(B) the head of any other Federal agency that, on a regular basis, procures, or provides Federal funds to pay or assist in paying the cost of procuring, material for cement or concrete projects.
(2) Cement or concrete project
The term “cement or concrete project” means a project for the construction or maintenance of a highway or other transportation facility or a Federal, State, or local government building or other public facility that—
(A) involves the procurement of cement or concrete; and
(B) is carried out, in whole or in part, using Federal funds.
(3) Recovered mineral component
The term “recovered mineral component” means—
(A) ground granulated blast furnace slag, excluding lead slag;
(B) coal combustion fly ash; and
(C) any other waste material or byproduct recovered or diverted from solid waste that the Administrator, in consultation with an agency head, determines should be treated as recovered mineral component under this section for use in cement or concrete projects paid for, in whole or in part, by the agency head.
(b) Implementation of requirements
(1) In general
Not later than 1 year after August 8, 2005, the Administrator and each agency head shall take such actions as are necessary to implement fully all procurement requirements and incentives in effect as of August 8, 2005 (including guidelines under section 6962 of this title) that provide for the use of cement and concrete incorporating recovered mineral component in cement or concrete projects.
(2) Priority
In carrying out paragraph (1), an agency head shall give priority to achieving greater use of recovered mineral component in cement or concrete projects for which recovered mineral components historically have not been used or have been used only minimally.
(3) Federal procurement requirements
The Administrator and each agency head shall carry out this subsection in accordance with section 6962 of this title.
(c) Full implementation study
(1) In general
The Administrator, in cooperation with the Secretary of Transportation and the Secretary of Energy, shall conduct a study to determine the extent to which procurement requirements, when fully implemented in accordance with subsection (b) of this section, may realize energy savings and environmental benefits attainable with substitution of recovered mineral component in cement used in cement or concrete projects.
(2) Matters to be addressed
The study shall—
(A) quantify—
(i) the extent to which recovered mineral components are being substituted for Portland cement, particularly as a result of procurement requirements; and
(ii) the energy savings and environmental benefits associated with the substitution;
(B) identify all barriers in procurement requirements to greater realization of energy savings and environmental benefits, including barriers resulting from exceptions from the law; and
(C)
(i) identify potential mechanisms to achieve greater substitution of recovered mineral component in types of cement or concrete projects for which recovered mineral components historically have not been used or have been used only minimally;
(ii) evaluate the feasibility of establishing guidelines or standards for optimized substitution rates of recovered mineral component in those cement or concrete projects; and
(iii) identify any potential environmental or economic effects that may result from greater substitution of recovered mineral component in those cement or concrete projects.
(3) Report
Not later than 30 months after August 8, 2005, the Administrator shall submit to Congress a report on the study.
(d) Additional procurement requirements
Unless the study conducted under subsection (c) of this section identifies any effects or other problems described in subsection (c)(2)(C)(iii) of this section that warrant further review or delay, the Administrator and each agency head shall, not later than 1 year after the date on which the report under subsection (c)(3) of this section is submitted, take additional actions under this chapter to establish procurement requirements and incentives that provide for the use of cement and concrete with increased substitution of recovered mineral component in the construction and maintenance of cement or concrete projects—
(1) to realize more fully the energy savings and environmental benefits associated with increased substitution; and
(2) to eliminate barriers identified under subsection (c)(2)(B) of this section.
(e) Effect of section
Nothing in this section affects the requirements of section 6962 of this title (including the guidelines and specifications for implementing those requirements).

Source

(Pub. L. 89–272, title II, § 6005, as added Pub. L. 109–58, title I, § 108(a),Aug. 8, 2005, 119 Stat. 612.)
Codification

Another section 6005 ofPub. L. 89–272is classified to section 6966a of this title.

The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.

The most recent Classification Table update that we have noticed was Tuesday, August 13, 2013

An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.

42 USCDescription of ChangeSession YearPublic LawStatutes at Large

This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


40 CFR - Protection of Environment

40 CFR Part 3 - CROSS-MEDIA ELECTRONIC REPORTING

40 CFR Part 9 - OMB APPROVALS UNDER THE PAPERWORK REDUCTION ACT

40 CFR Part 278 - CRITERIA FOR THE MANAGEMENT OF GRANULAR MINE TAILINGS (CHAT) IN ASPHALT CONCRETE AND PORTLAND CEMENT CONCRETE IN TRANSPORTATION CONSTRUCTION PROJECTS FUNDED IN WHOLE OR IN PART BY FEDERAL FUNDS

40 CFR Part 451 - CONCENTRATED AQUATIC ANIMAL PRODUCTION POINT SOURCE CATEGORY

 

LII has no control over and does not endorse any external Internet site that contains links to or references LII.