42 U.S. Code § 7511c - Control of interstate ozone air pollution

(a) Ozone transport regions
A single transport region for ozone (within the meaning of section 7506a (a) of this title), comprised of the States of Connecticut, Delaware, Maine, Maryland, Massachusetts, New Hampshire, New Jersey, New York, Pennsylvania, Rhode Island, Vermont, and the Consolidated Metropolitan Statistical Area that includes the District of Columbia, is hereby established by operation of law. The provisions of section 7506a (a)(1) and (2) of this title shall apply with respect to the transport region established under this section and any other transport region established for ozone, except to the extent inconsistent with the provisions of this section. The Administrator shall convene the commission required (under section 7506a (b) of this title) as a result of the establishment of such region within 6 months of November 15, 1990.
(b) Plan provisions for States in ozone transport regions
(1) In accordance with section 7410 of this title, not later than 2 years after November 15, 1990 (or 9 months after the subsequent inclusion of a State in a transport region established for ozone), each State included within a transport region established for ozone shall submit a State implementation plan or revision thereof to the Administrator which requires the following—
(A) that each area in such State that is in an ozone transport region, and that is a metropolitan statistical area or part thereof with a population of 100,000 or more comply with the provisions of section 7511a (c)(2)(A) of this title (pertaining to enhanced vehicle inspection and maintenance programs); and
(B) implementation of reasonably available control technology with respect to all sources of volatile organic compounds in the State covered by a control techniques guideline issued before or after November 15, 1990.
(2) Within 3 years after November 15, 1990, the Administrator shall complete a study identifying control measures capable of achieving emission reductions comparable to those achievable through vehicle refueling controls contained in section 7511a (b)(3) of this title, and such measures or such vehicle refueling controls shall be implemented in accordance with the provisions of this section. Notwithstanding other deadlines in this section, the applicable implementation plan shall be revised to reflect such measures within 1 year of completion of the study. For purposes of this section any stationary source that emits or has the potential to emit at least 50 tons per year of volatile organic compounds shall be considered a major stationary source and subject to the requirements which would be applicable to major stationary sources if the area were classified as a Moderate nonattainment area.
(c) Additional control measures
(1) Recommendations
Upon petition of any State within a transport region established for ozone, and based on a majority vote of the Governors on the Commission  [1] (or their designees), the Commission  [1] may, after notice and opportunity for public comment, develop recommendations for additional control measures to be applied within all or a part of such transport region if the commission determines such measures are necessary to bring any area in such region into attainment by the dates provided by this subpart. The commission shall transmit such recommendations to the Administrator.
(2) Notice and review
Whenever the Administrator receives recommendations prepared by a commission pursuant to paragraph (1) (the date of receipt of which shall hereinafter in this section be referred to as the “receipt date”), the Administrator shall—
(A) immediately publish in the Federal Register a notice stating that the recommendations are available and provide an opportunity for public hearing within 90 days beginning on the receipt date; and
(B) commence a review of the recommendations to determine whether the control measures in the recommendations are necessary to bring any area in such region into attainment by the dates provided by this subpart and are otherwise consistent with this chapter.
(3) Consultation
In undertaking the review required under paragraph (2)(B), the Administrator shall consult with members of the commission of the affected States and shall take into account the data, views, and comments received pursuant to paragraph (2)(A).
(4) Approval and disapproval
Within 9 months after the receipt date, the Administrator shall
(A) determine whether to approve, disapprove, or partially disapprove and partially approve the recommendations;
(B) notify the commission in writing of such approval, disapproval, or partial disapproval; and
(C) publish such determination in the Federal Register. If the Administrator disapproves or partially disapproves the recommendations, the Administrator shall specify—
(i) why any disapproved additional control measures are not necessary to bring any area in such region into attainment by the dates provided by this subpart or are otherwise not consistent with the  [2] chapter; and
(ii) recommendations concerning equal or more effective actions that could be taken by the commission to conform the disapproved portion of the recommendations to the requirements of this section.
(5) Finding
Upon approval or partial approval of recommendations submitted by a commission, the Administrator shall issue to each State which is included in the transport region and to which a requirement of the approved plan applies, a finding under section 7410 (k)(5) of this title that the implementation plan for such State is inadequate to meet the requirements of section 7410 (a)(2)(D) of this title. Such finding shall require each such State to revise its implementation plan to include the approved additional control measures within one year after the finding is issued.
(d) Best available air quality monitoring and modeling
For purposes of this section, not later than 6 months after November 15, 1990, the Administrator shall promulgate criteria for purposes of determining the contribution of sources in one area to concentrations of ozone in another area which is a nonattainment area for ozone. Such criteria shall require that the best available air quality monitoring and modeling techniques be used for purposes of making such determinations.


[1]  So in original. Probably should not be capitalized.

[2]  So in original. Probably should be “this”.

Source

(July 14, 1955, ch. 360, title I, § 184, as added Pub. L. 101–549, title I, § 103,Nov. 15, 1990, 104 Stat. 2448.)

The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.

The most recent Classification Table update that we have noticed was Tuesday, August 13, 2013

An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.

42 USCDescription of ChangeSession YearPublic LawStatutes at Large

This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


40 CFR - Protection of Environment

40 CFR Part 3 - CROSS-MEDIA ELECTRONIC REPORTING

40 CFR Part 6 - PROCEDURES FOR IMPLEMENTING THE NATIONAL ENVIRONMENTAL POLICY ACT AND ASSESSING THE ENVIRONMENTAL EFFECTS ABROAD OF EPA ACTIONS

40 CFR Part 9 - OMB APPROVALS UNDER THE PAPERWORK REDUCTION ACT

40 CFR Part 51 - REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS

40 CFR Part 60 - STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES

40 CFR Part 62 - APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS

40 CFR Part 81 - DESIGNATION OF AREAS FOR AIR QUALITY PLANNING PURPOSES

40 CFR Part 85 - CONTROL OF AIR POLLUTION FROM MOBILE SOURCES

40 CFR Part 86 - CONTROL OF EMISSIONS FROM NEW AND IN-USE HIGHWAY VEHICLES AND ENGINES

40 CFR Part 89 - CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES

40 CFR Part 90 - CONTROL OF EMISSIONS FROM NONROAD SPARK-IGNITION ENGINES AT OR BELOW 19 KILOWATTS

40 CFR Part 91 - CONTROL OF EMISSIONS FROM MARINE SPARK-IGNITION ENGINES

40 CFR Part 92 - CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES

40 CFR Part 93 - DETERMINING CONFORMITY OF FEDERAL ACTIONS TO STATE OR FEDERAL IMPLEMENTATION PLANS

40 CFR Part 94 - CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES

40 CFR Part 451 - CONCENTRATED AQUATIC ANIMAL PRODUCTION POINT SOURCE CATEGORY

40 CFR Part 1027 - FEES FOR ENGINE, VEHICLE, AND EQUIPMENT COMPLIANCE PROGRAMS

40 CFR Part 1036 - CONTROL OF EMISSIONS FROM NEW AND IN-USE HEAVY-DUTY HIGHWAY ENGINES

40 CFR Part 1037 - CONTROL OF EMISSIONS FROM NEW HEAVY-DUTY MOTOR VEHICLES

40 CFR Part 1039 - CONTROL OF EMISSIONS FROM NEW AND IN-USE NONROAD COMPRESSION-IGNITION ENGINES

40 CFR Part 1045 - CONTROL OF EMISSIONS FROM SPARK-IGNITION PROPULSION MARINE ENGINES AND VESSELS

40 CFR Part 1048 - CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK-IGNITION ENGINES

40 CFR Part 1051 - CONTROL OF EMISSIONS FROM RECREATIONAL ENGINES AND VEHICLES

40 CFR Part 1054 - CONTROL OF EMISSIONS FROM NEW, SMALL NONROAD SPARK-IGNITION ENGINES AND EQUIPMENT

40 CFR Part 1060 - CONTROL OF EVAPORATIVE EMISSIONS FROM NEW AND IN-USE NONROAD AND STATIONARY EQUIPMENT

40 CFR Part 1065 - ENGINE-TESTING PROCEDURES

40 CFR Part 1066 - VEHICLE-TESTING PROCEDURES

40 CFR Part 1068 - GENERAL COMPLIANCE PROVISIONS FOR HIGHWAY, STATIONARY, AND NONROAD PROGRAMS

40 CFR Part 1074 - PREEMPTION OF STATE STANDARDS AND PROCEDURES FOR WAIVER OF FEDERAL PREEMPTION FOR NONROAD ENGINES AND NONROAD VEHICLES

 

LII has no control over and does not endorse any external Internet site that contains links to or references LII.