42 U.S. Code § 9616 - Schedules

(a) Assessment and listing of facilities
It shall be a goal of this chapter that, to the maximum extent practicable—
(1) not later than January 1, 1988, the President shall complete preliminary assessments of all facilities that are contained (as of October 17, 1986) on the Comprehensive Environmental Response, Compensation, and Liability Information System (CERCLIS) including in each assessment a statement as to whether a site inspection is necessary and by whom it should be carried out; and
(2) not later than January 1, 1989, the President shall assure the completion of site inspections at all facilities for which the President has stated a site inspection is necessary pursuant to paragraph (1).
(b) Evaluation
Within 4 years after October 17, 1986, each facility listed (as of October 17, 1986) in the CERCLIS shall be evaluated if the President determines that such evaluation is warranted on the basis of a site inspection or preliminary assessment. The evaluation shall be in accordance with the criteria established in section 9605 of this title under the National Contingency Plan for determining priorities among release for inclusion on the National Priorities List. In the case of a facility listed in the CERCLIS after October 17, 1986, the facility shall be evaluated within 4 years after the date of such listing if the President determines that such evaluation is warranted on the basis of a site inspection or preliminary assessment.
(c) Explanations
If any of the goals established by subsection (a) or (b) of this section are not achieved, the President shall publish an explanation of why such action could not be completed by the specified date.
(d) Commencement of RI/FS
The President shall assure that remedial investigations and feasibility studies (RI/FS) are commenced for facilities listed on the National Priorities List, in addition to those commenced prior to October 17, 1986, in accordance with the following schedule:
(1) not fewer than 275 by the date 36 months after October 17, 1986, and
(2) if the requirement of paragraph (1) is not met, not fewer than an additional 175 by the date 4 years after October 17, 1986, an additional 200 by the date 5 years after October 17, 1986, and a total of 650 by the date 5 years after October 17, 1986.
(e) Commencement of remedial action
The President shall assure that substantial and continuous physical on-site remedial action commences at facilities on the National Priorities List, in addition to those facilities on which remedial action has commenced prior to October 17, 1986, at a rate not fewer than:
(1) 175 facilities during the first 36-month period after October 17, 1986; and
(2) 200 additional facilities during the following 24 months after such 36-month period.

Source

(Pub. L. 96–510, title I, § 116, as added Pub. L. 99–499, title I, § 116,Oct. 17, 1986, 100 Stat. 1653.)
References in Text

This chapter, referred to in subsec. (a), was in the original “this Act”, meaning Pub. L. 96–510, Dec. 11, 1980, 94 Stat. 2767, known as the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, which is classified principally to this chapter. For complete classification of this Act to the Code, see Short Title note set out under section 9601 of this title and Tables.

The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.

The most recent Classification Table update that we have noticed was Tuesday, August 13, 2013

An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.

42 USCDescription of ChangeSession YearPublic LawStatutes at Large

This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


40 CFR - Protection of Environment

40 CFR Part 3 - CROSS-MEDIA ELECTRONIC REPORTING

40 CFR Part 9 - OMB APPROVALS UNDER THE PAPERWORK REDUCTION ACT

40 CFR Part 30 - UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND AGREEMENTS WITH INSTITUTIONS OF HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS

40 CFR Part 31 - UNIFORM ADMINISTRATIVE REQUIREMENTS FOR GRANTS AND COOPERATIVE AGREEMENTS TO STATE AND LOCAL GOVERNMENTS

40 CFR Part 34 - NEW RESTRICTIONS ON LOBBYING

40 CFR Part 35 - STATE AND LOCAL ASSISTANCE

40 CFR Part 300 - NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY PLAN

40 CFR Part 305 - COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) ADMINISTRATIVE HEARING PROCEDURES FOR CLAIMS AGAINST THE SUPERFUND

40 CFR Part 307 - COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION, AND LIABILITY ACT (CERCLA) CLAIMS PROCEDURES

40 CFR Part 451 - CONCENTRATED AQUATIC ANIMAL PRODUCTION POINT SOURCE CATEGORY

45 CFR - Public Welfare

45 CFR Part 1304 - PROGRAM PERFORMANCE STANDARDS FOR THE OPERATION OF HEAD START PROGRAMS BY GRANTEE AND DELEGATE AGENCIES

 

LII has no control over and does not endorse any external Internet site that contains links to or references LII.