43 U.S. Code § 390h–12h - El Paso Water Reclamation and Reuse Project

(a) Authorization
The Secretary, in cooperation with the appropriate State and local authorities, is authorized to participate in the design, planning, and construction of the El Paso Water Reclamation and Reuse Project to reclaim and reuse wastewater in the service area of the El Paso Water Utilities Public Service Board, El Paso, Texas.
(b) Cost share
The Federal share of the cost of a project described in subsection (a) of this section shall not exceed 25 percent of the total cost.
(c) Limitation
The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a) of this section.

Source

(Pub. L. 102–575, title XVI, § 1622, as added Pub. L. 104–266, § 2(a)(2),Oct. 9, 1996, 110 Stat. 3292.)

The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.

The most recent Classification Table update that we have noticed was Tuesday, August 13, 2013

An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.

43 USCDescription of ChangeSession YearPublic LawStatutes at Large

This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


10 CFR - Energy

10 CFR Part 903 - POWER AND TRANSMISSION RATES

 

LII has no control over and does not endorse any external Internet site that contains links to or references LII.