(a) General authority; Federal and non-Federal cost shares
The Secretary is authorized to participate with appropriate Federal, State, regional, and local authorities in studies to determine the feasibility of water reclamation and reuse projects recommended for such study pursuant to section
390h–1 of this title. The Federal share of the costs of such feasibility studies shall not exceed 50 per centum of the total, except that the Secretary may increase the Federal share of the costs of such feasibility study if the Secretary determines, based upon a demonstration of financial hardship on the part of the non-Federal participant, that the non-Federal participant is unable to contribute at least 50 per centum of the costs of such study. The Secretary may accept as part of the non-Federal cost share the contribution of such in-kind services by the non-Federal participant that the Secretary determines will contribute substantially toward the conduct and completion of the study.
(b) Federal share considered project costs; reimbursement
The Federal share of feasibility studies, including those described in sections
390h–4 and
390h–6 through
390h–8 of this title, shall be considered as project costs and shall be reimbursed in accordance with the Federal reclamation laws, if the project studied is implemented.
(c) Matters to be considered
In addition to the requirements of other Federal laws, feasibility studies conducted by the Secretary or the non-Federal project sponsor under sections
390h to
390h–39 of this title shall consider, among other things—
(1)near- and long-term water demand and supplies in the study area;
(2)all potential uses for reclaimed water;
(3)at least two alternative measures or technologies available for water reclamation, distribution, and reuse for the project under consideration;
(4)public health and environmental quality issues associated with use of reclaimed water;
(5)whether development of the water reclamation and reuse measures under study would—
(A)reduce, postpone, or eliminate development of new or expanded water supplies,
(B)reduce or eliminate the use of existing diversions from natural watercourses or withdrawals from aquifers, or
(C)reduce the demand on existing Federal water supply facilities;
(6)the market or dedicated use for reclaimed water in the project’s service area; and
(7)the financial capability of the non-Federal project sponsor to fund its proportionate share of the project’s construction costs on an annual basis.
(a) General authority; Federal and non-Federal cost shares
The Secretary is authorized to participate with appropriate Federal, State, regional, and local authorities in studies to determine the feasibility of water reclamation and reuse projects recommended for such study pursuant to section
390h–1 of this title. The Federal share of the costs of such feasibility studies shall not exceed 50 per centum of the total, except that the Secretary may increase the Federal share of the costs of such feasibility study if the Secretary determines, based upon a demonstration of financial hardship on the part of the non-Federal participant, that the non-Federal participant is unable to contribute at least 50 per centum of the costs of such study. The Secretary may accept as part of the non-Federal cost share the contribution of such in-kind services by the non-Federal participant that the Secretary determines will contribute substantially toward the conduct and completion of the study.
(b) Federal share considered project costs; reimbursement
The Federal share of feasibility studies, including those described in sections
390h–4 and
390h–6 through
390h–8 of this title, shall be considered as project costs and shall be reimbursed in accordance with the Federal reclamation laws, if the project studied is implemented.
(c) Matters to be considered
In addition to the requirements of other Federal laws, feasibility studies conducted by the Secretary or the non-Federal project sponsor under sections
390h to
390h–39 of this title shall consider, among other things—
(1)near- and long-term water demand and supplies in the study area;
(2)all potential uses for reclaimed water;
(3)at least two alternative measures or technologies available for water reclamation, distribution, and reuse for the project under consideration;
(4)public health and environmental quality issues associated with use of reclaimed water;
(5)whether development of the water reclamation and reuse measures under study would—
(A)reduce, postpone, or eliminate development of new or expanded water supplies,
(B)reduce or eliminate the use of existing diversions from natural watercourses or withdrawals from aquifers, or
(C)reduce the demand on existing Federal water supply facilities;
(6)the market or dedicated use for reclaimed water in the project’s service area; and
(7)the financial capability of the non-Federal project sponsor to fund its proportionate share of the project’s construction costs on an annual basis.
The Federal reclamation laws, referred to in subsec. (b), are defined in section
390h(a) of this title.
Amendments
1996—Subsec. (c). Pub. L. 104–266, § 4(1), substituted “conducted by the Secretary or the non-Federal project sponsor” for “authorized” in introductory provisions.
Subsec. (c)(3). Pub. L. 104–266, § 4(2), substituted “at least two alternative measures or technologies available for water reclamation, distribution, and reuse for the project under consideration” for “measures and technologies available for water reclamation, distribution, and reuse”.
Subsec. (c)(5)(C). Pub. L. 104–266, § 4(4), added subpar. (C).
Subsec. (c)(6), (7). Pub. L. 104–266, § 4(3), (5), added pars. (6) and (7).
The table below lists the classification updates, since Jan. 3, 2012, for this section. Updates to a broader range of sections may be found at the update page for containing chapter, title, etc.
The most recent Classification Table update that we have noticed was Friday, May 3, 2013
An empty table indicates that we see no relevant changes listed in the classification tables. If you suspect that our system may be missing something, please double-check with the Office of the Law Revision Counsel.
43 USC
Description of Change
Session Year
Public Law
Statutes at Large
This is a list of parts within the Code of Federal Regulations for which this US Code section provides rulemaking authority.
It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.
LII has no control over and does not endorse any external Internet site that contains links to or references LII.