10 CFR 73.72 - Requirement for advance notice of shipment of formula quantities of strategic special nuclear material, special nuclear material of moderate strategic significance, or irradiated reactor fuel.

Status message

There is 1 rule appearing in the Federal Register for 10 CFR Part 73. View below or at eCFR (GPOAccess)
§ 73.72 Requirement for advance notice of shipment of formula quantities of strategic special nuclear material, special nuclear material of moderate strategic significance, or irradiated reactor fuel.
(a) A licensee, other than one specified in paragraph (b) of this section, who, in a single shipment, plans to deliver to a carrier for transport, to take delivery at the point where a shipment is delivered to a carrier for transport, to import, to export, or to transport a formula quantity of strategic special nuclear material, special nuclear material of moderate strategic significance, or irradiated reactor fuel4 required to be protected in accordance with § 73.37, shall:

Footnote(s):
4 For purposes of 10 CFR 73.72, the terms “irradiated reactor fuel” as described in 10 CFR 73.37 and “spent nuclear fuel” are used interchangeably.

(1) Notify in writing the Director, Division of Security Policy, Office of Nuclear Security and Incident Response, U.S. Nuclear Regulatory Commission, Washington, DC 20555, using any appropriate method listed in§ 73.4 of this part. Classified and safeguards notifications shall be sent to the NRC headquarters classified mailing address listed in appendix A to this part.
(2) Assure that the notification will be received at least 10 days before transport of the shipment commences at the shipping facility;
(3) Include the following information in the notification:
(i) The name(s), address(es), and telephone number(s) of the shipper, receiver, and carrier(s);
(ii) A physical description of the shipment:
(A) For a shipment other than irradiated fuel, the elements, isotopes, enrichment, and quantity;
(B) For a shipment of irradiated fuel, the physical form, quantity, type of reactor, and original enrichment;
(iii) A listing of the mode(s) of shipment, transfer point(s), and route(s) to be used;
(iv) The estimated time and date that shipment will commence and that each country along the route is scheduled to be entered; and
(v) The estimated time and date of arrival of the shipment at the destination;
(4) The NRC Headquarters Operations Center shall be notified about the shipment status by telephone at the phone numbers listed in appendix A to this part. Classified and safeguards notifications shall be made by secure telephone. The notifications shall take place at the following intervals:
(i) At least 2 days before commencement of the shipment;
(ii) Two hours before commencement of the shipment; and
(iii) Once the shipment is received at its destination.
(5) The NRC Headquarters Operations Center shall be notified by telephone of schedule changes of more than 6 hours at the phone numbers listed in appendix A to this part. Classified and safeguards notifications shall be made by secure telephone.
(b) A licensee who conducts an on-site transfer of spent nuclear fuel that does not travel upon or cross a public highway is exempt from the requirements of this section for that transfer.
[52 FR 9653, Mar. 26, 1987, as amended at 53 FR 4111, Feb. 12, 1988; 60 FR 24552, May 9, 1995; 67 FR 3586, Jan. 25, 2002; 68 FR 58820, Oct. 10, 2003; 74 FR 62684, Dec. 1, 2009; 78 FR 29557, May 20, 2013]

Title 10 published on 2015-01-01.

The following are only the Rules published in the Federal Register after the published date of Title 10.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2015-01-26; vol. 80 # 16 - Monday, January 26, 2015
    1. 80 FR 3865 - Safeguards Information—Modified Handling Categorization; Change for Materials Facilities
      GPO FDSys XML | Text
      NUCLEAR REGULATORY COMMISSION
      Direct final rule; confirmation of effective date, NUREG issuance, and correction.
      Effective date: The effective date of January 28, 2015, for the direct final rule published September 30, 2014 (79 FR 58664), is confirmed. The correction of the “Compatibility Table for Direct Final Rule” is effective January 26, 2015.
      10 CFR Parts 30, 37, 73, and 150

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
Statutes at Large

Title 10 published on 2015-01-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 10 CFR Part 73 after this date.

  • 2015-04-22; vol. 80 # 77 - Wednesday, April 22, 2015
    1. 80 FR 22434 - Enhanced Security of Special Nuclear Material
      GPO FDSys XML | Text
      NUCLEAR REGULATORY COMMISSION
      Regulatory basis.
      At this time, the NRC is not soliciting public comments on this document. There will be an opportunity for formal public comment on the proposed rule when it is published in the Federal Register .
      10 CFR Part 73