14 CFR 23.1101 - Induction air preheater design.

Beta! The text on the eCFR tab represents the unofficial eCFR text at ecfr.gov.
§ 23.1101 Induction air preheater design.

Each exhaust-heated, induction air preheater must be designed and constructed to -

(a) Ensure ventilation of the preheater when the induction air preheater is not being used during engine operation;

(b) Allow inspection of the exhaust manifold parts that it surrounds; and

(c) Allow inspection of critical parts of the preheater itself.

[Doc. No. 4080, 29 FR 17955, Dec. 18, 1964, as amended by Amdt. 23-43, 58 FR 18974, Apr. 9, 1993]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 14 published on 2015-01-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 14 CFR Part 23 after this date.

  • 2015-12-09; vol. 80 # 236 - Wednesday, December 9, 2015
    1. 80 FR 76379 - Special Conditions: Cirrus Aircraft Corporation, SF50; Auto Throttle
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Federal Aviation Administration
      Final special conditions.
      The effective date of these special conditions is December 9, 2015 and are applicable on December 2, 2015.
      14 CFR Part 23