14 CFR 23.1310 - Power source capacity and distribution.

prev | next
§ 23.1310 Power source capacity and distribution.

(a) Each installation whose functioning is required for type certification or under operating rules and that requires a power supply is an “essential load” on the power supply. The power sources and the system must be able to supply the following power loads in probable operating combinations and for probable durations:

(1) Loads connected to the system with the system functioning normally.

(2) Essential loads, after failure of any one prime mover, power converter, or energy storage device.

(3) Essential loads after failure of -

(i) Any one engine on two-engine airplanes; and

(ii) Any two engines on airplanes with three or more engines.

(4) Essential loads for which an alternate source of power is required, after any failure or malfunction in any one power supply system, distribution system, or other utilization system.

(b) In determining compliance with paragraphs (a)(2) and (3) of this section, the power loads may be assumed to be reduced under a monitoring procedure consistent with safety in the kinds of operation authorized. Loads not required in controlled flight need not be considered for the two-engine-inoperative condition on airplanes with three or more engines.

[Doc. No. FAA-2009-0738, 76 FR 75760, Dec. 2, 2011]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 14 published on 03-May-2017 03:58

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 14 CFR Part 23 after this date.

  • 2017-04-24; vol. 82 # 77 - Monday, April 24, 2017
    1. 82 FR 18841 - Special Conditions: Viking Air, Ltd., Models DHC-6-100/-200/-300; Avmax Aviation Services, Inc., Installation of Rechargeable Lithium Batteries
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Federal Aviation Administration
      Final special conditions; request for comments.
      The effective date of these special conditions is April 24, 2017. We must receive your comments by June 8, 2017.
      14 CFR Part 23

Pages