25 CFR 170.443 - What is required to successfully include a proposed transportation facility in the NTTFI?

§ 170.443 What is required to successfully include a proposed transportation facility in the NTTFI?

(a) A proposed transportation facility is any transportation facility, including a highway bridge, that will serve public transportation needs, meets the eligibility requirements of the TTP, and does not currently exist. It must meet the eligibility requirements of the TTP and be open to the public when constructed. In order to have a proposed facility placed on the NTTFI, a Tribe must submit all of the following to the BIADOT/FHWA Quality Assurance Team for consideration:

(1) A Tribal resolution or other official action identifying support for the facility and its placement on the NTTFI.

(2) A copy of the Tribe's LRTP containing:

(i) A description of the current land use and identification of land ownership within the proposed road's corridor (including what public easements may be required);

(ii) A description of need and outcomes for the facility including a description of the project's termini; and

(iii) The sources of funding to be used for construction.

(3) If the landowner is a public authority other than the Tribe or BIA, documentation from the public authority that the proposed road has been identified in their LRTP, STIP approved by FHWA, or other published transportation planning documents.

(4) Documentation clearly identifying that easements or rights-of-way have been acquired or a clear written statement of willingness to provide a right-of-way from each landowner along the route.

(5) Certification that a public involvement process has been carried out for the proposed road.

(6) A synopsis discussing the project's anticipated environmental impacts as well as the engineering and construction challenges.

(7) Documentation that the project can meet financial or fiscal constraint requirements including financial information demonstrating that the project can be implemented using existing or reasonably available funding sources, and that the project route can be adequately maintained after construction. (See 23 U.S.C. 134 and 135.)

(8) Documentation identifying the entity responsible for maintenance of the facility after construction is completed.

(b) For those proposed roads that currently exist in the NTTFI, the requirements identified above as paragraphs (a)(1) through (a)(8) of this section, must be completed and submitted for approval to BIA and FHWA by November 7, 2019, in order to remain on the inventory.

[ 81 FR 78463, Nov. 7, 2016, as amended at 82 FR 50313, Oct. 31, 2017]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 25 published on 01-Nov-2017 11:09

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 25 CFR Part 170 after this date.

  • 2017-10-31; vol. 82 # 209 - Tuesday, October 31, 2017
    1. 82 FR 50312 - Tribal Transportation Program; Delay of Compliance Date
      GPO FDSys XML | Text
      DEPARTMENT OF THE INTERIOR, Bureau of Indian Affairs
      Interim final rule.
      This rule is effective October 31, 2017. Submit comments by November 30, 2017. Compliance with § 170.443 for proposed roads currently in the NTTFI to remain in the inventory is required by November 7, 2019.
      25 CFR Part 170
The section you are viewing is cited by the following CFR sections.