30 CFR 816.100 - What are the standards for conducting reclamation contemporaneously with mining?

prev | next
§ 816.100 What are the standards for conducting reclamation contemporaneously with mining?

You must reclaim all land disturbed by surface mining activities as contemporaneously as practicable with the mining operations, except when the mining operations are conducted in accordance with a variance for concurrent surface and underground mining activities under § 785.18 of this chapter. Reclamation activities include, but are not limited to, backfilling, grading, soil replacement, revegetation, and stream restoration.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code
U.S. Code: Title 30 - MINERAL LANDS AND MINING