30 CFR Subpart E - Subpart E—Oil and Gas Well-Completion Operations
- § 250.500 General requirements.
- § 250.501 Definition.
- § 250.502 [Reserved]
- § 250.503 Emergency shutdown system.
- § 250.504 Hydrogen sulfide.
- § 250.505 Subsea completions.
- §§ 250.506-250.508 [Reserved]
- § 250.509 Well-completion structures on fixed platforms.
- § 250.510 Diesel engine air intakes.
- § 250.511 Traveling-block safety device.
- § 250.512 Field well-completion rules.
- § 250.513 Approval and reporting of well-completion operations.
- § 250.514 Well-control fluids, equipment, and operations.
- §§ 250.515-250.517 [Reserved]
- § 250.518 Tubing and wellhead equipment.
-
Casing Pressure Management (§§ 250.519 - 250.531)
- § 250.519 What are the requirements for casing pressure management?
- § 250.520 How often do I have to monitor for casing pressure?
- § 250.521 When do I have to perform a casing diagnostic test?
- § 250.522 How do I manage the thermal effects caused by initial production on a newly completed or recompleted well?
- § 250.523 When do I have to repeat casing diagnostic testing?
- § 250.524 How long do I keep records of casing pressure and diagnostic tests?
- § 250.525 When am I required to take action from my casing diagnostic test?
- § 250.526 What do I submit if my casing diagnostic test requires action?
- § 250.527 What must I include in my notification of corrective action?
- § 250.528 What must I include in my casing pressure request?
- § 250.529 What are the terms of my casing pressure request?
- § 250.530 What if my casing pressure request is denied?
- § 250.531 When does my casing pressure request approval become invalid?