30 CFR Subpart K - Ground Control
- § 77.1000 Highwalls, pits and spoil banks; plans.
- § 77.1000-1 Filing of plan.
- § 77.1001 Stripping; loose material.
- § 77.1002 Box cuts; spoil material placement.
- § 77.1003 Benches.
- § 77.1004 Ground control; inspection and maintenance; general.
- § 77.1005 Scaling highwalls; general.
- § 77.1006 Highwalls; men working.
- § 77.1007 Drilling; general.
- § 77.1008 Relocation of drills; safeguards.
- § 77.1009 Drill; operation.
- § 77.1010 Collaring holes.
- § 77.1011 Drill holes; guarding.
- § 77.1012 Jackhammers; operation; safeguards.
- § 77.1013 Air drills; safeguards.
The following state regulations pages link to this page.