33 CFR § 117.503 - Tensas River.

§ 117.503 Tensas River.

The draw of the S15 bridge, mile 27.3 at Clayton shall open on signal if at least 48 hours notice is given.

[USCG-2025-1113, 91 FR 3035, Jan. 26, 2026]