40 CFR Appendix Table 1 to Subpart ZZZZZZ of Part 63, Applicability of General Provisions to Aluminum, Copper, and Other Nonferrous Foundries Area Sources

prev | next
Table 1 to Subpart ZZZZZZ of Part 63 - Applicability of General Provisions to Aluminum, Copper, and Other Nonferrous Foundries Area Sources

As required in § 63.11555, “What General Provisions apply to this subpart?,” you must comply with each requirement in the following table that applies to you.

Citation Subject Applies to subpart ZZZZZZ? Explanation
§ 63.1(a)(1) , (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12), (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e) Applicability Yes § 63.11544(f) exempts affected sources from the obligation to obtain a title V operating permit.
§ 63.1(a)(5) , (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d) Reserved No
§ 63.2 Definitions Yes
§ 63.3 Units and Abbreviations Yes
§ 63.4 Prohibited Activities and Circumvention Yes
§ 63.5 Preconstruction Review and Notification Requirements Yes
§ 63.6(a) , (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1), (e)(3)(i), (e)(3)(iii)-(e)(3)(ix), (f)(2), (f)(3), (g), (i), (j) Compliance with Standards and Maintenance Requirements Yes
§ 63.6(f)(1) Compliance with Nonopacity Emission Standards No Subpart ZZZZZZ requires continuous compliance with all requirements in this subpart.
§ 63.6(h)(1) , (h)(2), (h)(5)-(h)(9) Compliance with Opacity and Visible Emission Limits No Subpart ZZZZZZ does not contain opacity or visible emission limits.
§ 63.6(b)(6) , (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv) Reserved No
§ 63.7 Applicability and Performance Test Dates Yes
§ 63.8(a)(1) , (b)(1), (f)(1)-(5), (g) Monitoring Requirements Yes
§ 63.8(a)(2) , (a)(4), (b)(2)-(3), (c), (d), (e), (f)(6), (g) Continuous Monitoring Systems No Subpart ZZZZZZ does not require a flare or CPMS, COMS or CEMS.
§ 63.8(a)(3) [Reserved] No
§ 63.9(a) , (b)(1), (b)(2)(i)-(iii), (b)(5), (c), (d), (e), (h)(1)-(h)(3), (h)(5), (h)(6), (j) Notification Requirements Yes Subpart ZZZZZZ requires submission of Notification of Compliance Status within 120 days of compliance date unless a performance test is required.
§ 63.9(b)(2)(iv)-(v) , (b)(4), (f), (g), (i) No
§ 63.9(b)(3) , (h)(4) Reserved No
§ 63.10(a) , (b)(1), (b)(2)(i)-(v), (vii), (vii)(C), (viii), (ix), (b)(3), (d)(1)-(2), (d)(4), (d)(5), (f) Recordkeeping and Reporting Requirements Yes
§ 63.10(b)(2)(vi) , (b)(2)(vii)(A)-(B), (c), (d)(3), (e) No Subpart ZZZZZZ does not require a CPMS, COMS, CEMS, or opacity or visible emissions limit.
§ 63.10(c)(2)-(c)(4) , (c)(9) Reserved No
§ 63.11 Control Device Requirements No
§ 63.12 State Authority and Delegations Yes
§§ 63.13-63 .16 Addresses, Incorporations by Reference, Availability of Information, Performance Track Provisions Yes

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code