40 CFR Appendix Table 2 to Subpart JJJJ of Part 63, Applicability of 40 CFR Part 63 General Provisions to Subpart JJJJ

prev | next
Table 2 to Subpart JJJJ of Part 63 - Applicability of 40 CFR Part 63 General Provisions to Subpart JJJJ

You must comply with the applicable General Provisions requirements according to the following table:

General provisions reference Applicable to subpart JJJJ Explanation
§ 63.1(a)(1)-(4) Yes.
§ 63.1(a)(5) No Reserved.
§ 63.1(a)(6)-(8) Yes.
§ 63.1(a)(9) No Reserved.
§ 63.1(a)(10)-(14) Yes.
§ 63.1(b)(1) No Subpart JJJJ specifies applicability.
§ 63.1(b)(2)-(3) Yes.
§ 63.1(c)(1) Yes.
§ 63.1(c)(2) No Area sources are not subject to emission standards of subpart JJJJ.
§ 63.1(c)(3) No Reserved.
§ 63.1(c)(4) Yes.
§ 63.1(c)(5) Yes.
§ 63.1(d) No Reserved.
§ 63.1(e) Yes.
§ 63.1(e)(4) No.
§ 63.2 Yes Additional definitions in subpart JJJJ.
§ 63.3(a)-(c) Yes.
§ 63.4(a)(1)-(3) Yes.
§ 63.4(a)(4) No Reserved.
§ 63.4(a)(5) Yes.
§ 63.4(b)-(c) Yes.
§ 63.5(a)(1)-(2) Yes.
§ 63.5(b)(1) Yes.
§ 63.5(b)(2) No Reserved.
§ 63.5(b)(3)-(6) Yes.
§ 63.5(c) No Reserved.
§ 63.5(d) Yes.
§ 63.5(e) Yes.
§ 63.5(f) Yes.
§ 63.6(a) Yes Applies only when capture and control system is used to comply with the standard.
§ 63.6(b)(1)-(5) No
§ 63.6(b)(6) No Reserved.
§ 63.6(b)(7) Yes.
§ 63.6(c)(1)-(2) Yes.
§ 63.6(c)(3)-(4) No Reserved.
§ 63.6(c)(5) Yes.
§ 63.6(d) No Reserved.
§ 63.6(e) Yes Provisions pertaining to SSMP, and CMS do not apply unless an add-on control system is used to comply with the emission limitations.
§ 63.6(f) Yes.
§ 63.6(g) Yes.
§ 63.6(h) No Subpart JJJJ does not require continuous opacity monitoring systems (COMS).
§ 63.6(i)(1)-(14) Yes.
§ 63.6(i)(15) No Reserved.
§ 63.6(i)(16) Yes.
§ 63.6(j) Yes.
§ 63.7 Yes.
§ 63.8(a)(1)-(2) Yes.
§ 63.8(a)(3) No Reserved.
§ 63.8(a)(4) No.
§ 63.8(b) Yes.
§ 63.8(c)(1)-(3) Yes § 63.8(c)(1)(i) & (ii) only apply if you use capture and control systems and are required to have a start-up, shutdown, and malfunction plan.
§ 63.8(c)(4) Yes.
§ 63.8(c)(5) No Subpart JJJJ does not require COMS.
§ 63.8(c)(6)-(c)(8) Yes Provisions for COMS are not applicable.
§ 63.8(d)-(f) Yes § 63.8(f)(6) only applies if you use CEMS.
§ 63.8(g) Yes Only applies if you use CEMS.
§ 63.9(a) Yes.
§ 63.9(b)(1) Yes.
§ 63.9(b)(2) Yes Except § 63.3400(b)(1) requires submittal of initial notification for existing affected sources no later than 1 year before compliance date.
§ 63.9(b)(3)-(5) Yes.
§ 63.9(c)-(e) Yes.
§ 63.9(f) No Subpart JJJJ does not require opacity and visible emissions observations.
§ 63.9(g) Yes Provisions for COMS are not applicable.
§ 63.9(h)(1)-(3) Yes.
§ 63.9(h)(4) No Reserved.
§ 63.9(h)(5)-(6) Yes.
§ 63.9(i) Yes.
§ 63.9(j) Yes.
§ 63.10(a) Yes.
§ 63.10(b)(1)-(3) Yes § 63.10(b)(2)(i) through (v) only apply if you use a capture and control system.
§ 63.10(c)(1) Yes.
§ 63.10(c)(2)-(4) No Reserved.
§ 63.10(c)(5)-(8) Yes.
§ 63.10(c)(9) No Reserved.
§ 63.10(c)(10)-(15) Yes.
§ 63.10(d)(1)-(2) Yes.
§ 63.10(d)(3) No Subpart JJJJ does not require opacity and visible emissions observations.
§ 63.10(d)(4)-(5) Yes.
§ 63.10(e)(1)-(2) Yes Provisions for COMS are not applicable.
§ 63.10(e)(3)-(4) No.
§ 63.10(f) Yes.
§ 63.11 No.
§ 63.12 Yes.
§ 63.13 Yes.
§ 63.14 Yes Subpart JJJJ includes provisions for alternative ASME test methods that are incorporated by reference.
§ 63.15 Yes.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code