40 CFR Appendix Table 2 to Subpart X of Part 63, Emissions Limits for Secondary Lead Smelting Furnaces

Table 2 to Subpart X of Part 63 - Emissions Limits for Secondary Lead Smelting Furnaces
For vents from these processes . . . You must meet the following emissions limits . . . a
Total hydrocarbon ppm by volume expressed as propane corrected to 4 percent carbon dioxide Dioxin and furan (dioxins and furans) nanograms/dscm
expressed as TEQ corrected to
7 percent O2
Collocated blast and reverberatory furnaces (new and existing) 20 ppmv 0.50 ng/dscm.
Collocated blast and reverberatory furnaces when the reverberatory furnace is not operating for units that comments construction or reconstruction before June 9, 1994 360 ppmv 170 ng/dscm.
Collocated blast and reverberatory furnaces when the reverberatory furnace is not operating for units that commence construction or reconstruction after June 9, 1994 70 ppmv 170 ng/dscm.
Blast furnaces that commence construction or reconstruction before June 9, 1994 360 ppmv 170 ng/dscm.
Blast furnaces that commence construction or reconstruction after June 9, 1994 70 ppmv 170 ng/dscm.
Blast furnaces that commence construction or reconstruction after May 19, 2011 70 ppmv 10 ng/dscm.
Reverberatory and electric furnaces that commence construction or reconstruction before May 19, 2011 12 ppmv 0.20 ng/dscm.
Reverberatory and electric furnaces that commence construction or reconstruction after May 19, 2011 12 ppmv 0.10 ng/dscm.

a There are no standards for dioxins and furans during periods of startup and shutdown.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2015-08-22

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR Part 63 after this date.

  • 2017-04-06; vol. 82 # 65 - Thursday, April 6, 2017
    1. 82 FR 16736 - Mercury and Air Toxics Standards (MATS) Electronic Reporting Requirements
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final rule is effective on April 6, 2017.
      40 CFR Part 63