40 CFR Appendix Table 9 to Subpart U of Part 63, Routine Reports Required by This Subpart

prev | next
Table 9 to Subpart U of Part 63 - Routine Reports Required by This Subpart
Reference Description of report Due Date
§ 63.506(b) and subpart A Refer to § 63.506(b) , Table 1 of this subpart, and to subpart A Refer to subpart A.
§ 63.506(e)(3) Precompliance Report a 1. Existing affected sources: December 19, 2000.
2. New affected sources: with the application for approval of construction or reconstruction.
§ 63.506(e)(4) Emissions Averaging Plan September 19, 2000.
§ 63.506(e)(4)(iv) Updates to Emissions Averaging Plan 120 days prior to making the change necessitating the update.
§ 63.506(e)(5) Notification of Compliance Status b Within 150 days after the compliance date.
§ 63.506(e)(6) Periodic reports Semiannually, no later than 60 days after the end of each 6-month period. See § 63.506(e)(6)(i) for the due date for this report.
§ 63.506(e)(6)(xi) Quarterly for reports Emissions Averaging No later than 60 days after the end of each quarter. First report is due with the Notification of Compliance Status.
§ 63.506(e)(6)(xii) Quarterly reports upon request of the Administrator No later than 60 days after the end of each quarter.
§ 63.506(e)(7)(i) Storage Vessels Notification of Inspection At least 30 days prior to the refilling of each storage vessel or the inspection of each storage vessel.
§ 63.506(e)(7)(ii) Requests for Approval of a Nominal Control Efficiency for Use in Emissions Averaging Initial submittal is due with the Emissions Averaging Plan; later submittals are made at the discretion of the owner or operator as specified in § 63.506(e)(7)(ii)(B) .
§ 63.506(e)(7)(iii) Notification of Change in the Primary Product For notification under § 63.480(f)(3)(ii) - notification submittal date at the discretion of the owner or operator. c
For notification under § 63.480(f)(4)(ii) - within 6 months of making the determination.

a There may be two versions of this report due at different times; one for equipment subject to § 63.502 and one for other emission points subject to this subpart.

b There will be two versions of this report due at different times; one for equipment subject to § 63.502 and one for other emission points subject to this subpart.

c Note that the EPPU remains subject to this subpart until the notification under § 63.480(f)(3)(i) is made.

[ 66 FR 36928, July 16, 2001]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code