40 CFR Subpart OOOO - Subpart OOOO—Standards of Performance for Crude Oil and Natural Gas Facilities for Which Construction, Modification, or Reconstruction Commenced After August 23, 2011, and on or Before September 18, 2015

prev | next
  1. § 60.5360 What is the purpose of this subpart?
  2. § 60.5365 Am I subject to this subpart?
  3. § 60.5370 When must I comply with this subpart?
  4. § 60.5375 What standards apply to gas well affected facilities?
  5. § 60.5380 What standards apply to centrifugal compressor affected facilities?
  6. § 60.5385 What standards apply to reciprocating compressor affected facilities?
  7. § 60.5390 What standards apply to pneumatic controller affected facilities?
  8. § 60.5395 What standards apply to storage vessel affected facilities?
  9. § 60.5400 What equipment leak standards apply to affected facilities at an onshore natural gas processing plant?
  10. § 60.5401 What are the exceptions to the equipment leak standards for affected facilities at onshore natural gas processing plants?
  11. § 60.5402 What are the alternative emission limitations for equipment leaks from onshore natural gas processing plants?
  12. § 60.5405 What standards apply to sweetening units at onshore natural gas processing plants?
  13. § 60.5406 What test methods and procedures must I use for my sweetening units affected facilities at onshore natural gas processing plants?
  14. § 60.5407 What are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities at onshore natural gas processing plants?
  15. § 60.5408 What is an optional procedure for measuring hydrogen sulfide in acid gas—Tutwiler Procedure?
  16. § 60.5410 How do I demonstrate initial compliance with the standards for my gas well affected facility, my centrifugal compressor affected facility, my reciprocating compressor affected facility, my pneumatic controller affected facility, my storage vessel affected facility, and my equipment leaks and sweetening unit affected facilities at onshore natural gas processing plants?
  17. § 60.5411 What additional requirements must I meet to determine initial compliance for my covers and closed vent systems routing materials from storage vessels, reciprocating compressors and centrifugal compressor wet seal degassing systems?
  18. § 60.5412 What additional requirements must I meet for determining initial compliance with control devices used to comply with the emission standards for my storage vessel or centrifugal compressor affected facility?
  19. § 60.5413 What are the performance testing procedures for control devices used to demonstrate compliance at my storage vessel or centrifugal compressor affected facility?
  20. § 60.5415 How do I demonstrate continuous compliance with the standards for my gas well affected facility, my centrifugal compressor affected facility, my stationary reciprocating compressor affected facility, my pneumatic controller affected facility, my storage vessel affected facility, and my affected facilities at onshore natural gas processing plants?
  21. § 60.5416 What are the initial and continuous cover and closed vent system inspection and monitoring requirements for my storage vessel, centrifugal compressor and reciprocating compressor affected facilities?
  22. § 60.5417 What are the continuous control device monitoring requirements for my storage vessel or centrifugal compressor affected facility?
  23. § 60.5420 What are my notification, reporting, and recordkeeping requirements?
  24. § 60.5421 What are my additional recordkeeping requirements for my affected facility subject to VOC requirements for onshore natural gas processing plants?
  25. § 60.5422 What are my additional reporting requirements for my affected facility subject to VOC requirements for onshore natural gas processing plants?
  26. § 60.5423 What additional recordkeeping and reporting requirements apply to my sweetening unit affected facilities at onshore natural gas processing plants?
  27. § 60.5425 What part of the General Provisions apply to me?
  28. § 60.5430 What definitions apply to this subpart?
  29. Table 1 to Subpart OOOO of Part 60—Required Minimum Initial SO2 Emission Reduction Efficiency (Zi)
  30. Table 2 to Subpart OOOO of Part 60—Required Minimum SO2 Emission Reduction Efficiency (Zc)
  31. Table 3 to Subpart OOOO of Part 60—Applicability of General Provisions to Subpart OOOO
Source:
77 FR 49542, Aug. 16, 2012, unless otherwise noted.