Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring Requirements for Waste Management Units
To comply with Inspection or monitoring requirement Frequency of inspection or monitoring Method
a As specified in § 63.1256(e), the owner or operator shall comply with either the requirements of § 63.1256(e)(1) and (2) or § 63.1256(e)(4) and (5).
b Within 60 days of installation as specified in § 63.1256(f)(3).
TANKS:
63.1256(b)(3)(i) Inspect fixed roof and all openings for leaks Initially Semiannually Visual.
63.1256(b)(4) Inspect floating roof in accordance with §§ 63.120(a)(2) and (a)(3) See §§ 63.120(a)(2) and (a)(3) Visual.
63.1256(b)(5) Measure floating roof seal gaps in accordance with §§ 63.120(b)(2)(i) through (b)(4) See § 63.120(b)(2)(i) through (b)(4).
—Primary seal gaps Initially Once every 5 years (annually if no secondary seal).
—Secondary seal gaps Initially Semiannually
63.1256(b)(7)63.1256(b)(8) Inspect wastewater tank for control equipment failures and improper work practices Initially Semiannually Visual.
SURFACE IMPOUNDMENTS:
63.1256(c)(1)(i) Inspect cover and all openings for leaks Initially Semiannually Visual.
63.1256(c)(2) Inspect surface impoundment for control equipment failures and improper work practices Initially Semiannually Visual.
CONTAINERS:
63.1256(d)(1)(i)63.1256(d)(1)(ii) Inspect cover and all openings for leaks Initially Semiannually Visual.
63.1256(d)(3)(i) Inspect enclosure and all openings for leaks Initially Semiannually Visual.
63.1256(d)(4) Inspect container for control equipment failures and improper work practices Initially Semiannually Visual.
INDIVIDUAL DRAIN SYSTEMS a:
63.1256(e)(1)(i) Inspect cover and all openings to ensure there are no gaps, cracks, or holes Initially Semiannually Visual.
63.1256(e)(2) Inspect individual drain system for control equipment failures and improper work practices Initially Semiannually Visual.
63.1256(e)(4)(i) Verify that sufficient water is present to properly maintain integrity of water seals Initially Semiannually Visual.
63.1256(e)(4)(ii)63.1256(e)(5)(i) Inspect all drains using tightly-fitted caps or plugs to ensure caps and plugs are in place and properly installed Initially Semiannually Visual.
63.1256(e)(5)(ii) Inspect all junction boxes to ensure covers are in place and have no visible gaps, cracks, or holes Initially Semiannually Visual or smoke test or other means as specified.
63.1256(e)(5)(iii) Inspect unburied portion of all sewer lines for cracks and gaps Initially Semiannually Visual.
OIL-WATER SEPARATORS:
63.1256(f)(2)(i) Inspect fixed roof and all openings for leaks Initially Semiannually Visual.
63.1256(f)(3) Measure floating roof seal gaps in accordance with 40 CFR 60.696(d)(1) Initially b See 40 CFR 60.696(d)(1).
—Primary seal gaps Once every 5 years.
63.1256(f)(3) —Secondary seal gaps Initially b Annually.
63.1256(f)(4) Inspect oil-water separator for control equipment failures and improper work practices Initially Semiannually Visual.

Title 40 published on 2014-07-01.

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2015-08-19; vol. 80 # 160 - Wednesday, August 19, 2015
    1. 80 FR 50386 - Phosphoric Acid Manufacturing and Phosphate Fertilizer Production RTR and Standards of Performance for Phosphate Processing
      GPO FDSys: XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final action is effective on August 19, 2015. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of August 19, 2015.
      40 CFR Parts 60 and 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR Part 63 after this date.

  • 2015-08-31; vol. 80 # 168 - Monday, August 31, 2015
    1. 80 FR 52426 - Notice of Final Approval for the Operation of Pressure-Assisted Multi-Point Ground Flares at The Dow Chemical Company and ExxonMobil Chemical Company and Notice of Receipt of Approval Request for the Operation of a Pressure-Assisted Multi-Point Ground Flare at Occidental Chemical Corporation
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Notice; approval and request for comments.
      The AMEL for the MPGF at Dow's Propane Dehydrogenation Plant and Light Hydrocarbons Plant located at its Texas Operations site in Freeport, Texas, and ExxonMobil's Olefins Plant in Baytown, Texas, and Plastics Plant in Mont Belvieu, Texas are approved and effective August 31, 2015. Comments. Written comments on the AMEL request from OCC for their MPGF in Ingleside, Texas, or on the framework for streamlining future MPGF AMEL requests must be received on or before October 15, 2015. Public Hearing. Regarding the OCC MPGF in Ingleside, Texas, or the framework for streamlining future MPGF AMEL requests, if requested by September 8, 2015, we will hold a public hearing on September 15, 2015, from 1:00 p.m. [Eastern Standard Time] to 8:00 p.m. [Eastern Standard Time] in Corpus Christi, Texas. We will provide details on the public hearing on our Web site at: http://www.epa.gov/ttn/atw/groundflares/groundflarespg.html. To be clear, a public hearing will not be held unless someone specifically requests that the EPA hold a public hearing regarding the OCC MPGF or the framework for streamlining future MPGF AMEL requests. Please contact Ms. Virginia Hunt of the Sector Policies and Programs Division (E143-01), Office of Air Quality Planning and Standards, Environmental Protection Agency, Research Triangle Park, NC 27711; telephone number: (919) 541-0832; email address: hunt.virginia@epa.gov; to request a public hearing, to register to speak at the public hearing or to inquire as to whether a public hearing will be held. The last day to pre-register in advance to speak at the public hearing will be September 14, 2015.
      40 CFR Parts 60, 61 and 63

Pages