Table 1 of Subpart PPP of Part 63—Applicability of General Provisions to Subpart PPP Affected Sources
Reference Applies tosubpart PPP Explanation
63.1(a)(1) Yes § 63.1423 specifies definitions in addition to or that supersede definitions in § 63.2.
63.1(a)(2) Yes.
63.1(a)(3) Yes § 63.1422(f) through (k) of this subpart and § 63.160(b) identify those standards which overlap with the requirements of subparts PPP and H and specify how compliance shall be achieved.
63.1(a)(4) Yes Subpart PPP (this table) specifies the applicability of each paragraph in subpart A to subpart PPP.
63.1(a)(5) No Reserved.
63.1(a)(6) Yes.
63.1(a)(7)-(9) No Reserved.
63.1(a)(10) Yes.
63.1(a)(11) Yes.
63.1(a)(12)-(14) Yes.
63.1(b)(1) No § 63.1420(a) contains specific applicability criteria.
63.1(b)(2) Yes.
63.1(b)(3) Yes.
63.1(c)(1) Yes Subpart PPP (this table) specifies the applicability of each paragraph in subpart A to subpart PPP.
63.1(c)(2) No Area sources are not subject to subpart PPP.
63.1(c)(3) No Reserved.
63.1(c)(4) No Reserved.
63.1(c)(5) Yes Except that affected sources are not required to submit notifications overridden by this table.
63.1(d) No Reserved.
63.1(e) Yes.
63.2 Yes § 63.1423 specifies those subpart A definitions that apply to subpart PPP.
63.3 Yes.
63.4(a)(1)-(3) Yes.
63.4(a)(4) No Reserved.
63.4(a)(5) Yes.
63.4(b) Yes.
63.4(c) Yes.
63.5(a)(1) Yes Except the terms “source” and “stationary source” should be interpreted as having the same meaning as “affected source.”
63.5(a)(2) Yes.
63.5(b)(1) Yes Except § 63.1420(g) defines when construction or reconstruction is subject to new source standards.
63.5(b)(2) No Reserved.
63.5(b)(3) Yes.
63.5(b)(4) Yes Except that the initial notification requirements in § 63.1439(e)(3) shall apply instead of the requirements in § 63.9(b).
63.5(b)(5) Yes.
63.5(b)(6) Yes Except that § 63.1420(g) defines when construction or reconstruction is subject to the new source standards.
63.5(c) No Reserved.
63.5(d)(1)(i) Yes.
63.5(d)(1)(ii) Yes Except that § 63.5(d)(1)(ii)(H) does not apply.
63.5(d)(1)(iii) No § 63.1439(e)(5) and § 63.1434(e) specify notification of compliance status requirements.
63.5(d)(2) No.
63.5(d)(3) Yes Except § 63.5(d)(3)(ii) does not apply, and equipment leaks subject to § 63.1434 are exempt.
63.5(d)(4) Yes.
63.5(e) Yes.
63.5(f)(1) Yes.
63.5(f)(2) Yes Except that where § 63.9(b)(2) is referred to, the owner or operator need not comply.
63.6(a) Yes.
63.6(b)(1) Yes.
63.6(b)(2) Yes.
63.6(b)(3) Yes.
63.6(b)(4) Yes.
63.6(b)(5) Yes.
63.6(b)(6) No Reserved.
63.6(b)(7) No.
63.6(c)(1) Yes § 63.1422 specifies the compliance date.
63.6(c)(2) No.
63.6(c)(3) No Reserved.
63.6(c)(4) No Reserved.
63.6(c)(5) Yes.
63.6(d) No Reserved.
63.6(e) Yes Except as otherwise specified for individual paragraphs.
§ 63.6(e)(1)(i) No See § 63.1420(h)(4) for general duty requirement.
§ 63.6(e)(1)(ii) No.
63.6(e)(1)(iii) Yes.
63.6(e)(2) Yes.
§ 63.6(e)(3) No.
§ 63.6(f)(1) No.
63.6(f)(2) Yes Except 63.7(c), as referred to in § 63.6(f)(2)(iii)(D) does not apply, and except that § 63.6(f)(2)(ii) does not apply to equipment leaks subject to § 63.1434.
63.6(f)(3) Yes.
63.6(g) Yes.
63.6(h) No Subpart PPP does not require opacity and visible emission standards.
63.6(i)(1) Yes.
63.6(i)(2) Yes.
63.6(i)(3) Yes.
63.6(i)(4)(i)(A) Yes.
63.6(i)(4)(i)(B) No Dates are specified in § 63.1422(e) and § 63.1439(e)(4)(i) for all emission points except equipment leaks, which are covered under § 63.182(a)(6)(i).
63.6(i)(4)(ii) No.
63.6(i)(5)-(14) Yes.
63.6(i)(15) No Reserved.
63.6(i)(16) Yes.
63.6(j) Yes.
63.7(a)(1) Yes.
63.7(a)(2) No § 63.1439(e) (5) and (6) specify the submittal dates of performance test results for all emission points except equipment leaks; for equipment leaks, compliance demonstration results are reported in the Periodic Reports.
63.7(a)(3) Yes.
63.7(b) No § 63.1437(a)(4) specifies notification requirements.
63.7(c) No Except if the owner or operator chooses to submit an alternative nonopacity emission standard for approval under § 63.6(g).
63.7(d) Yes.
63.7(e)(1) No See § 63.1437(a).
63.7(e)(2) Yes.
63.7(e)(3) No Subpart PPP specifies requirements.
63.7(e)(4) Yes.
63.7(f) Yes Since a site-specific test plan is not required, the notification deadline in § 63.7(f)(2)(i) shall be 60 days prior to the performance test, and in § 63.7(f)(3) approval or disapproval of the alternative test method shall not be tied to the site-specific test plan.
63.7(g) Yes Except the notification of compliance status report requirements in § 63.1439(e)(5) shall apply instead of those in § 63.9(h). In addition, equipment leaks subject to § 63.1434 are not required to conduct performance tests.
63.7(h) Yes Except § 63.7(h)(4)(ii) is not applicable, since the site-specific test plans in § 63.7(c)(2) are not required.
63.8(a)(1) Yes.
63.8(a)(2) No.
63.8(a)(3) No Reserved.
63.8(a)(4) Yes.
63.8(b)(1) Yes.
63.8(b)(2) No Subpart PPP specifies locations to conduct monitoring.
63.8(b)(3) Yes.
63.8(c)(1) Yes.
63.8(c)(1)(i) No.
63.8(c)(1)(ii) No.
63.8(c)(1)(iii) No.
63.8(c)(2) Yes.
63.8(c)(3) Yes.
63.8(c)(4) No § 63.1438 specifies monitoring requirements; not applicable to equipment leaks, because § 63.1434 does not require continuous monitoring systems.
63.8(c)(5)-(8) No.
63.8(d) No.
63.8(e) No.
63.8(f)(1)-(3) Yes.
63.8(f)(4)(i) Yes Except the timeframe for submitting request is specified in § 63.1439(f) or (g); not applicable to equipment leaks, because § 63.1434 (through subpart H of this part) specifies acceptable alternative methods.
63.8(f)(4)(ii) Yes.
63.8(f)(4)(iii) Yes.
63.8(f)(5)(i) Yes.
63.8(f)(5)(ii) No.
63.8(f)(5)(iii) Yes.
63.8(f)(6) No Subpart PPP does not require CEMs.
63.8(g) No Data reduction procedures specified in § 63.1439(d) and (h); not applicable to equipment leaks.
63.9(a) Yes.
63.9(b) No The initial notification requirements are specified in § 63.1439(e)(3).
63.9(c) Yes.
63.9(d) Yes.
63.9(e) No § 63.1437(a)(4) specifies notification deadline.
63.9(f) No Subpart PPP does not require opacity and visible emission standards.
63.9(g) No.
63.9(h) No § 63.1439(e)(5) specifies notification of compliance status requirements.
63.9(i) Yes.
63.9(j) No.
63.10(a) Yes.
63.10(b)(1) No § 63.1439(a) specifies record retention requirements.
63.10(b)(2) No Subpart PPP specifies recordkeeping requirements.
63.10(b)(3) Yes.
63.10(c) No § 63.1439 specifies recordkeeping requirements.
63.10(d)(1) Yes.
63.10(d)(2) No § 63.1439(e)(5) and (6) specify performance test reporting requirements; not applicable to equipment leaks.
63.10(d)(3) No Subpart PPP does not require opacity and visible emission standards.
63.10(d)(4) Yes.
63.10(d)(5) No See § 63.1439(b)(1)(ii) for malfunction reporting requirements.
63.10(e) No § 63.1439 specifies reporting requirements.
63.10(f) Yes.
63.11 Yes.
63.12 Yes Except that the authority of § 63.177 (for equipment leaks) will not be delegated to States.
63.13-63.15 Yes.
[65 FR 26502, May 8, 2000, as amended at 71 FR 20461, Apr. 20, 2006; 79 FR 17381, Mar. 27, 2014]

Title 40 published on 2014-07-01.

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2015-08-19; vol. 80 # 160 - Wednesday, August 19, 2015
    1. 80 FR 50386 - Phosphoric Acid Manufacturing and Phosphate Fertilizer Production RTR and Standards of Performance for Phosphate Processing
      GPO FDSys: XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final action is effective on August 19, 2015. The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of August 19, 2015.
      40 CFR Parts 60 and 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2014-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR Part 63 after this date.

  • 2015-08-31; vol. 80 # 168 - Monday, August 31, 2015
    1. 80 FR 52426 - Notice of Final Approval for the Operation of Pressure-Assisted Multi-Point Ground Flares at The Dow Chemical Company and ExxonMobil Chemical Company and Notice of Receipt of Approval Request for the Operation of a Pressure-Assisted Multi-Point Ground Flare at Occidental Chemical Corporation
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Notice; approval and request for comments.
      The AMEL for the MPGF at Dow's Propane Dehydrogenation Plant and Light Hydrocarbons Plant located at its Texas Operations site in Freeport, Texas, and ExxonMobil's Olefins Plant in Baytown, Texas, and Plastics Plant in Mont Belvieu, Texas are approved and effective August 31, 2015. Comments. Written comments on the AMEL request from OCC for their MPGF in Ingleside, Texas, or on the framework for streamlining future MPGF AMEL requests must be received on or before October 15, 2015. Public Hearing. Regarding the OCC MPGF in Ingleside, Texas, or the framework for streamlining future MPGF AMEL requests, if requested by September 8, 2015, we will hold a public hearing on September 15, 2015, from 1:00 p.m. [Eastern Standard Time] to 8:00 p.m. [Eastern Standard Time] in Corpus Christi, Texas. We will provide details on the public hearing on our Web site at: http://www.epa.gov/ttn/atw/groundflares/groundflarespg.html. To be clear, a public hearing will not be held unless someone specifically requests that the EPA hold a public hearing regarding the OCC MPGF or the framework for streamlining future MPGF AMEL requests. Please contact Ms. Virginia Hunt of the Sector Policies and Programs Division (E143-01), Office of Air Quality Planning and Standards, Environmental Protection Agency, Research Triangle Park, NC 27711; telephone number: (919) 541-0832; email address: hunt.virginia@epa.gov; to request a public hearing, to register to speak at the public hearing or to inquire as to whether a public hearing will be held. The last day to pre-register in advance to speak at the public hearing will be September 14, 2015.
      40 CFR Parts 60, 61 and 63

Pages