40 CFR Appendix Table 9 to Subpart U of Part 63 - Table 9 to Subpart U of Part 63—Routine Reports Required by This Subpart

prev | next
Table 9 to Subpart U of Part 63—Routine Reports Required by This Subpart
Reference Description of report Due Date
§ 63.506(b) and subpart A Refer to § 63.506(b), Table 1 of this subpart, and to subpart A Refer to subpart A.
§ 63.506(e)(3) Precompliance Report a 1. Existing affected sources: December 19, 2000.
2. New affected sources: with the application for approval of construction or reconstruction.
§ 63.506(e)(4) Emissions Averaging Plan September 19, 2000.
§ 63.506(e)(4)(iv) Updates to Emissions Averaging Plan 120 days prior to making the change necessitating the update.
§ 63.506(e)(5) Notification of Compliance Status b Within 150 days after the compliance date.
§ 63.506(e)(6) Periodic reports Semiannually, no later than 60 days after the end of each 6-month period. See § 63.506(e)(6)(i) for the due date for this report.
§ 63.506(e)(6)(xi) Quarterly for reports Emissions Averaging No later than 60 days after the end of each quarter. First report is due with the Notification of Compliance Status.
§ 63.506(e)(6)(xii) Quarterly reports upon request of the Administrator No later than 60 days after the end of each quarter.
§ 63.506(e)(7)(i) Storage Vessels Notification of Inspection At least 30 days prior to the refilling of each storage vessel or the inspection of each storage vessel.
§ 63.506(e)(7)(ii) Requests for Approval of a Nominal Control Efficiency for Use in Emissions Averaging Initial submittal is due with the Emissions Averaging Plan; later submittals are made at the discretion of the owner or operator as specified in § 63.506(e)(7)(ii)(B).
§ 63.506(e)(7)(iii) Notification of Change in the Primary Product For notification under § 63.480(f)(3)(ii)—notification submittal date at the discretion of the owner or operator. c
For notification under § 63.480(f)(4)(ii)—within 6 months of making the determination.

a There may be two versions of this report due at different times; one for equipment subject to § 63.502 and one for other emission points subject to this subpart.

b There will be two versions of this report due at different times; one for equipment subject to § 63.502 and one for other emission points subject to this subpart.

c Note that the EPPU remains subject to this subpart until the notification under § 63.480(f)(3)(i) is made.

[66 FR 36928, July 16, 2001]