40 CFR Part 63, Subpart ZZZZ, Table 3 to Subpart ZZZZ of Part 63 - Subsequent Performance Tests

Status message

There are 11 Updates appearing in the Federal Register for 40 CFR Part 63. View below or at eCFR (GPOAccess)
View PDF at GPOPt. 63, Subpt. ZZZZ, Table 3
Table 3 to Subpart ZZZZ of Part 63—Subsequent Performance Tests
As stated in §§ 63.6615 and 63.6620, you must comply with the following subsequent performance test requirements:
For each . . . Complying with the requirement to . . . You must . . .
1 After you have demonstrated compliance for two consecutive tests, you may reduce the frequency of subsequent performance tests to annually. If the results of any subsequent annual performance test indicate the stationary RICE is not in compliance with the CO or formaldehyde emission limitation, or you deviate from any of your operating limitations, you must resume semiannual performance tests.
1. New or reconstructed 2SLB stationary RICE >500 HP located at major sources; new or reconstructed 4SLB stationary RICE ≥250 HP located at major sources; and new or reconstructed CI stationary RICE >500 HP located at major sources Reduce CO emissions and not using a CEMS Conduct subsequent performance tests semiannually.1
2. 4SRB stationary RICE ≥5,000 HP located at major sources Reduce formaldehyde emissions Conduct subsequent performance tests semiannually.1
3. Stationary RICE >500 HP located at major sources and new or reconstructed 4SLB stationary RICE 250≤HP≤500 located at major sources Limit the concentration of formaldehyde in the stationary RICE exhaust Conduct subsequent performance tests semiannually.1
4. Existing non-emergency, non-black start CI stationary RICE >500 HP that are not limited use stationary RICE Limit or reduce CO emissions and not using a CEMS Conduct subsequent performance tests every 8,760 hours or 3 years, whichever comes first.
5. Existing non-emergency, non-black start CI stationary RICE >500 HP that are limited use stationary RICE Limit or reduce CO emissions and not using a CEMS Conduct subsequent performance tests every 8,760 hours or 5 years, whichever comes first.
[78 FR 6711, Jan. 30, 2013]

Title 40 published on 2015-07-01.

The following are only the Rules published in the Federal Register after the published date of Title 40.

For a complete list of all Rules, Proposed Rules, and Notices view the Rulemaking tab.

  • 2015-12-07; vol. 80 # 234 - Monday, December 7, 2015
    1. 80 FR 76152 - National Emission Standards for Aerospace Manufacturing and Rework Facilities Risk and Technology Review
      GPO FDSys: XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final action is effective on December 7, 2015.
      40 CFR Part 63

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 40 published on 2015-07-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 40 CFR Part 63 after this date.

  • 2015-12-07; vol. 80 # 234 - Monday, December 7, 2015
    1. 80 FR 76152 - National Emission Standards for Aerospace Manufacturing and Rework Facilities Risk and Technology Review
      GPO FDSys XML | Text
      ENVIRONMENTAL PROTECTION AGENCY
      Final rule.
      This final action is effective on December 7, 2015.
      40 CFR Part 63