47 CFR 25.130 - Filing requirements for transmitting earth stations.

prev | next
§ 25.130 Filing requirements for transmitting earth stations.

(a) Applications for a new or modified transmitting earth station facility shall be submitted on FCC Form 312, and associated Schedule B, accompanied by any required exhibits, except for those earth station applications filed on FCC Form 312EZ pursuant to § 25.115(a). All such earth station license applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. Additional filing requirements for Earth Stations on Vessels are described in §§ 25.221 and 25.222. Additional filing requirements for Vehicle-Mounted Earth Stations are described in § 25.226. Additional filing requirements for Earth Stations Aboard Aircraft are described in § 25.227. In addition, applicants that are not required to submit applications on Form 312EZ, other than ESV, VMES or ESAA applicants, must submit the following information to be used as an “informative” in the public notice issued under § 25.151 as an attachment to their application:

(1) A detailed description of the service to be provided, including frequency bands and satellites to be used. The applicant must identify either the specific satellite(s) with which it plans to operate, or the eastern and western boundaries of the arc it plans to coordinate.

(2) The diameter or equivalent diameter of the antenna.

(3) Proposed power and power density levels.

(4) Identification of any random access technique, if applicable.

(5) Identification of a specific rule or rules for which a waiver is requested.

(b) A frequency coordination analysis in accordance with § 25.203(b) must be provided for earth stations transmitting in the frequency bands shared with equal rights between terrestrial and space services, except applications for user transceiver units associated with the NVNG MSS, which must instead provide the information required by § 25.135, and applications for 1.6/2.4 GHz MSS user transceivers, which must demonstrate that the transceivers will operate in compliance with relevant requirements in § 25.213. Also, applications for transmitting earth stations must include any notification or demonstration required by any other relevant provision in § 25.203.

(c) In those cases where an applicant is filing a number of essentially similar applications, showings of a general nature applicable to all of the proposed stations may be submitted in the initial application and incorporated by reference in subsequent applications.

(d) Transmissions of signals or programming to non-U.S. licensed satellites, and to and/or from foreign points by means of U.S.-licensed fixed satellites may be subject to restrictions as a result of international agreements or treaties. The Commission will maintain public information on the status of any such agreements.

(e) [Reserved]

(f) Applicants seeking to operate in a shared government/non-government band must provide the half-power beam width of their proposed earth station antenna, as an attachment to their applications.

(g) Parties may apply, either in an initial application or an application for modification of license, for operating authority for multiple transmitting FSS earth stations that are not eligible for blanket or network licensing under another section of this part in the following circumstances:

(1) The antennas would transmit in frequency bands shared with terrestrial services on a co-primary basis and the antennas would be sited within an area bounded by 1 second of latitude and 1 second of longitude.

(2) The antennas would transmit in frequency bands allocated to FSS on a primary basis and there is no co-primary allocation for terrestrial services, and the antennas would be sited within an area bounded by 10 seconds of latitude and 10 seconds of longitude.

Note to paragraph (g):

This paragraph does not apply to applications for blanket-licensed earth station networks filed pursuant to § 25.115(c) or § 25.218; applications for conventional Ka-band hub stations filed pursuant to § 25.115(e); applications for NGSO FSS gateway earth stations filed pursuant to § 25.115(f); applications filed pursuant to §§ 25.221, § 25.222, § 25.226, or § 25.227; or applications for 29 GHz NGSO MSS feeder-link stations in a complex as defined in § 25.257.

[ 56 FR 24016, May 28, 1991, as amended at 58 FR 68059, Dec. 23, 1993; 59 FR 53327, Oct. 21, 1994; 61 FR 4367, Feb. 6, 1996; 61 FR 9952, Mar. 12, 1996; 62 FR 5929, Feb. 10, 1997; 62 FR 64172, Dec. 4, 1997; 69 FR 29901, May 26, 2004; 69 FR 47795, Aug. 6, 2004; 70 FR 4783, Jan. 31, 2005; 70 FR 32253, June 2, 2005; 74 FR 57098, Nov. 4, 2009; 78 FR 14926, Mar. 8, 2013; 79 FR 8317, Feb. 12, 2014; 81 FR 55330, Aug. 18, 2016]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 47 published on 09-May-2017 04:29

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR Part 25 after this date.

  • 2017-04-20; vol. 82 # 75 - Thursday, April 20, 2017
    1. 82 FR 18580 - Review of Foreign Ownership Policies for Broadcast, Common Carrier and Aeronautical Radio Licensees
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Final rule; announcement of effective date.
      This final rule is effective on April 20, 2017. The amendments to 47 CFR 1.5000 through 1.5004, 25.105, 73.1010 and 74.5, published at 81 FR 86586, December 1, 2016, are effective on April 20, 2017.
      47 CFR Parts 1, 25, 73, and 74

Pages