47 CFR 25.161 - Automatic termination of station authorization.

§ 25.161 Automatic termination of station authorization.

A station authorization shall be automatically terminated in whole or in part without further notice to the licensee upon:

(a)

(1) The failure to meet an applicable milestone specified in § 25.164(a) or (b), if no authorized space station is functional in orbit;

(2) The failure to meet an applicable milestone specified in § 25.164(b)(1) or (2), if at least one authorized space station is functional in an authorized orbit, which failure will result in the termination of authority for the space stations not in orbit as of the milestone date, but allow for technically identical replacements; or

(3) The failure to meet any other milestone or construction requirement imposed as a condition of authorization. In the case of a space station authorization when at least one authorized space station is functional in orbit, however, such termination will be with respect to only the authorization for any space stations not in orbit as of the milestone date.

(b) The expiration of the license term, unless, in the case of an earth station license, an application for renewal of the license has been filed with the Commission pursuant to § 25.121(e) or, in the case of a space station license, an application for extension of the license term has been filed with the Commission; or

(c) The removal or modification of the facilities which renders the station not operational for more than 90 days, unless specific authority is requested.

(d) The failure to maintain 50 percent of the maximum number of NGSO space stations authorized for service following the 9-year milestone period as functional space stations in authorized orbits, which failure will result in the termination of authority for the space stations not in orbit as of the date of noncompliance, but allow for technically identical replacements.

[ 56 FR 24016, May 28, 1991, as amended at 68 FR 51507, Aug. 27, 2003; 78 FR 8425, Feb. 6, 2013; 79 FR 8320, Feb. 12, 2014; 82 FR 59985, Dec. 18, 2017]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 47 published on 06-Feb-2018 04:06

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR Part 25 after this date.

  • 2018-02-05; vol. 83 # 24 - Monday, February 5, 2018
    1. 83 FR 5057 - Petitions for Reconsideration of Action in Rulemaking Proceeding
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Petitions for reconsideration.
      Oppositions to the Petitions must be filed on or before February 20, 2018. Replies to an opposition must be filed on or before March 2, 2018.
      47 CFR Parts 2 and 25

Pages

The section you are viewing is cited by the following CFR sections.