47 CFR 27.1238 - Eligible costs.

Beta! The text on the eCFR tab represents the unofficial eCFR text at ecfr.gov.
§ 27.1238 Eligible costs.

(a) The costs listed in paragraphs (b) through (f) of this section are eligible costs.

(b) Pre-transition costs:

(1) Engineering/Consulting

(i) Evaluation of equipment;

(ii) RX site identification;

(iii) EBS Programming plan covering the BTA;

(iv) Market Analysis (MHz per POP Study);

(v) RF study (interference analysis); and

(vi) Transition Plan creation and support;

(2) Project management (may be sourced external);

(3) Filing fees;

(4) Legal fees;

(5) Site acquisition fees-contractor; and

(6) Arbitrator fee;

(c) Transmission facility - analog conversion costs:

(1) Transmitter upgrading or retuning;

(2) Combiner re-tuning or new;

(3) Power divider/circulator adjacent channel combiner hardware;

(4) STL/fiber relocation;

(5) Miscellaneous material costs (including cabling and connectors);

(6) Contract labor:

(i) Tower;

(ii) Building modifications;

(iii) Electrical/HVAC; and

(iv) Mechanical

(7) Engineering:

(i) Structural; and

(ii) Pathway Interference Analysis.

(8) Equipment disposal/shipping

(9) Program Management (third party or internal costs to manage the BTA conversion); and

(10) Travel and Per Diem Cost.

(d) Transmission facility-digital conversion costs:

(1) New transmitter or retuning;

(2) Digital compression equipment-TX site (including encoders, controller, and software);

(3) Combiners-new or retune;

(4) Power divider/circulator adjacent channel combiner hardware;

(5) Cabinets, cabling, feedline and connectors;

(6) STL - fiber digital upgrade;

(7) Installation cost due to adding additional broadcast antenna (4 or more digital channels required);

(8) Contract labor:

(i) Tower;

(ii) Building modifications;

(iii) Electrical/HVAC; and

(iv) Mechanical.

(9) Proof of performance testing (may be contracted);

(10) Engineering:

(i) Structural; and

(ii) Path engineering analysis.

(11) Equipment disposal/shipping;

(12) Training;

(13) Program management (third party or internal costs to manage BTA conversion);

(14) Travel and per diem costs.

(e) Qualified receive-sites only-modifications (analog and digital):

(1) Digital set top boxes;

(2) Downconverters (with filtering)/antennas (replacement downconverters);

(3) Contract labor:

(i) Antenna change/DC install (antenna change may be necessary); and

(ii) Electrical; and mechanical

(4) Project management (third party or internal costs to manage the BTA conversion);

(5) Proof of performance testing (may be contracted);

(6) Mini headend (cost effective distribution method):

(i) Modulators, combiners;

(ii) Equipment racks; and

(iii) Amplifiers

(7) Cable, connectors; and

(8) Training.

(f) Miscellaneous transition fees.

(1) Filing fees;

(2) Arbitrator fee; and

(3) Legal fees.

[71 FR 35193, June 19, 2006]

Title 47 published on 2015-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR Part 27 after this date.

  • 2015-11-23; vol. 80 # 225 - Monday, November 23, 2015
    1. 80 FR 73044 - Unlicensed Use of TV Band and 600 MHz Band Spectrum
      GPO FDSys XML | Text
      FEDERAL COMMUNICATIONS COMMISSION
      Final rule.
      Effective December 23, 2015, except for the amendments to §§ 15.713(b)(2)(iv) through (v), (j)(4), (j)(10), and (j)(11), 15.715(n) through (q), 27.1320, and 95.1111(d), which contain new or modified information collection requirements that require approval by the OMB under the Paperwork Reduction Act (PRA). The Commission will publish a document in the Federal Register announcing the effective date when approved by OMB. The incorporation by reference listed in the rules is approved by the Director of the Federal Register as of December 23, 2015.
      47 CFR Parts 2, 15, 27, 74, and 95