47 CFR 90.119 - Application requirements.

Beta! The text on the eCFR tab represents the unofficial eCFR text at ecfr.gov.
§ 90.119 Application requirements.

(a) Part 1, subpart F of this chapter contains the application filing procedures for the Wireless Telecommunications Services, including applications for new base, fixed, or mobile station authorizations governed by this part.

(b) If the control station(s) will operate on the same frequency as the mobile station, and if the height of the control station(s) antenna(s) will not exceed 6.1 meters (20 feet) above ground or an existing man-made structure (other than an antenna structure), there is no limit on the number of such stations which may be authorized. Appropriate items on FCC Form 601 shall be completed showing the frequency, the station class, the total number of control stations, the emission, and the output power of the highest powered control station. Applicants in the 470-512 MHz band must furnish the relevant information for all control stations.

[63 FR 68963, Dec. 14, 1998]

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.

United States Code
Statutes at Large

Title 47 published on 2015-10-01

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 47 CFR Part 90 after this date.

  • 2015-11-25; vol. 80 # 227 - Wednesday, November 25, 2015
    1. 80 FR 73696 - Public Safety and Homeland Security Bureau Seeks Comment on FirstNet's Incumbent Relocation Proposal
      GPO FDSys XML | Text
      Proposed rule.
      Comments are due on or before December 9, 2015.
      47 CFR Part 90