49 CFR 178.255-6 - Loading and unloading accessories.

§ 178.255-6 Loading and unloading accessories.

(a) When installed, gauging, loading and air inlet devices, including their valves, shall be provided with adequate means for their secure closure; and means shall also be provided for the closing of pipe connections of valves.

(b) Interior heater coils, if installed, must be of extra heavy pipe and so constructed that breaking off of exterior connections will not cause leakage of tanks.

This is a list of United States Code sections, Statutes at Large, Public Laws, and Presidential Documents, which provide rulemaking authority for this CFR Part.

This list is taken from the Parallel Table of Authorities and Rules provided by GPO [Government Printing Office].

It is not guaranteed to be accurate or up-to-date, though we do refresh the database weekly. More limitations on accuracy are described at the GPO site.


United States Code

Title 49 published on 16-Dec-2017 04:00

The following are ALL rules, proposed rules, and notices (chronologically) published in the Federal Register relating to 49 CFR Part 178 after this date.

  • 2017-03-30; vol. 82 # 60 - Thursday, March 30, 2017
    1. 82 FR 15796 - Hazardous Materials: Harmonization With International Standards (RRR)
      GPO FDSys XML | Text
      DEPARTMENT OF TRANSPORTATION, Pipeline and Hazardous Materials Safety Administration
      Final rule.
      Effective date: This rule is effective March 30, 2017, except for instruction 22, which is effective January 2, 2019. Voluntary compliance date: January 1, 2017. Delayed compliance date: Unless otherwise specified, compliance with the amendments adopted in this final rule is required beginning January 1, 2018. Incorporation by reference date: The incorporation by reference of certain publications listed in this rule is approved by the Director of the Federal Register as of March 30, 2017.
      49 CFR Parts 107, 171, 172, 173, 175, 176, 178, and 180