49 CFR Subpart D - Subpart D—Construction
- § 195.200 Scope.
- § 195.202 Compliance with specifications or standards.
- § 195.204 Inspection—general.
- § 195.205 Repair, alteration and reconstruction of aboveground breakout tanks that have been in service.
- § 195.206 Material inspection.
- § 195.207 Transportation of pipe.
- § 195.208 Welding of supports and braces.
- § 195.210 Pipeline location.
- § 195.212 Bending of pipe.
- § 195.214 Welding procedures.
- § 195.216 Welding: Miter joints.
- § 195.222 Welders and welding operators: Qualification of welders and welding operators.
- § 195.224 Welding: Weather.
- § 195.226 Welding: Arc burns.
- § 195.228 Welds and welding inspection: Standards of acceptability.
- § 195.230 Welds: Repair or removal of defects.
- § 195.234 Welds: Nondestructive testing.
- §§ 195.236-195.244 [Reserved]
- § 195.246 Installation of pipe in a ditch.
- § 195.248 Cover over buried pipeline.
- § 195.250 Clearance between pipe and underground structures.
- § 195.252 Backfilling.
- § 195.254 Above ground components.
- § 195.256 Crossing of railroads and highways.
- § 195.258 Valves: General.
- § 195.260 Valves: Location.
- § 195.262 Pumping equipment.
- § 195.264 Impoundment, protection against entry, normal/emergency venting or pressure/vacuum relief for aboveground breakout tanks.
- § 195.266 Construction records.