(e)

(e) A statement by an appropriate foundation manager (as defined in section 4946(b)) that the amounts to be set aside will actually be paid for the specific project within a specified period of time that ends not more than 60 months after the date of the first set-aside, or a statement showing good cause why the period for paying the amount set aside should be extended (including a showing that the proposed project could not be divided into two or more projects covering periods of no more than 60 months each) and setting forth the extension of time required.

Source

26 CFR § 53.4942(a)-3


Scoping language

None
Is this correct? or