(ii)

Inspector Actions. The inspector shall:
(A) Select random times for postchill monitoring.
(B) Monitor each chill system twice per shift.
(C) Conduct subgroup tests at preselected random times.
(2) Actions to be taken when the subgroup absolute limit is exceeded. If either an inspector or establishment subgroup test exceeds the subgroup absolute limit of tolerance plus 5(T + 5), the establishment shall determine if any of the last 5 postchill monitoring subgroups resulted in a CUSUM above the start number.
(i) If all of the past 5 postchill monitoring subgroups resulted in a CUSUM at or below the start number, the establishment shall immediately retest a subgroup to determine sample validity. If this retest subgroup total exceeds tolerance, the establishment shall proceed as if CUSUM reaches the action number and shall begin process actions as set forth in paragraph (b)(3)(iv)(e)(3) of this section.
(ii) If any of the past 5 postchill monitoring subgroups resulted in a CUSUM above the start number, the establishment shall proceed as if CUSUM reaches the action number and shall begin process actions as set forth in paragraph (b)(3)(iv)(e)(3) of this section.
(3) Actions to be taken when the CUSUM reaches the action number. Once CUSUM reaches the action number, the process is judged to be not in control.
(i) Establishment Actions. The establishment shall:
(A) Notify the inspector in charge and the production supervisor responsible for product in the chiller.
(B) Suspend random time postchill subgroup testing.
(C) Immediately conduct an additional postchill subgroup test. If the retest subgroup total exceeds tolerance, the establishment shall identify subsequent product for rework. Product will continue accumulating for rework until a subsequent subgroup test results in a subgroup total equal to or less than tolerance.
(D) After two consecutive additional postchill subgroup tests results in subgroup totals equal to or less than tolerance:

Source

9 CFR § 381.76


Scoping language

None
Is this correct? or